How many solar installs has Fidelity Home Energy done in California, and which license number is on its installs?

Fidelity Home Energy has 1,762 residential solar installs interconnected in California, active in the records from 2014 through 2019 (May 9, 2014 to Oct 16, 2019), most of them in Alameda County (352), Contra Costa County (284) and San Diego County (247). The license number recorded on most of its installs, 790709, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,762
Last 24 months
0
Total capacity
6,620.7 kW DC
Median system size
3.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 1,554 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 9, 2014
Latest install
Oct 16, 2019
Counties
20
Utilities
PGE 1,397, SDGE 259, SCE 106
CSLB license
790709

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
20142380
20154060
20162580
20174040
20182760
20191800
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 1,762 interconnected installs with a tariff recorded (1,762) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.091652.0%not counted
NEM 2.084648.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Fidelity Home Energy’s installs. No residential system in the file lists a third-party owner name that matches Fidelity Home Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1,567 of Fidelity Home Energy’s 1,762 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,137, 72.6%) used modules recorded as Qcells.

Across all years, 1,761 of Fidelity Home Energy’s 1,762 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (815, 46.3%) used inverters recorded as APsystems (Altenergy Power System).

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells01,137
SolarWorld0425
LG03
Canadian Solar01
Lightway Green New Energy01
Inverter makerAPsystems (Altenergy Power System)0815
SolarEdge0671
Enphase0160
Delta Electronics0155
PV Powered010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,567 of 1,762 installs, inverters on 1,761. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
790709Not found in the CSLB License Master file pulled Nov 4, 20261,495

License numbers are the ones the utilities recorded on the interconnection applications (1,496 of 1,762 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Fidelity Home Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019Total
City and County of San Francisco790709172340
unincorporated Marin County790709112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda352
Contra Costa284
San Diego247
Santa Clara221
Solano155
San Mateo110
San Francisco96
Sonoma85
Los Angeles48
Orange46
San Joaquin31
Marin29
Napa29
Riverside22
Yolo2
Lake1
San Benito1
San Bernardino1
Santa Cruz1
Ventura1

Top cities

CityInstalls
San Jose151
Oakland128
San Francisco96
San Diego84
Vallejo69
Hayward60
Antioch56
Fremont46
Richmond39
Fairfield34
Santa Rosa32
Chula Vista29
Concord28
Brentwood27
Pittsburg25

Names as recorded by the utilities

The utilities recorded this installer under 12 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Fidelity Home Energy1,279
FIDELITY HOME ENERGY382
FIdelity Home Energy43
fidelity home energy27
FIDELITY HOME ENERGY, INC.13
Fidelity Home energy8
Fidelity Home Energy Inc4
Fidelity home energy2
fIDELITY hOME ENERGY1
fIDELITY HOME ENERGY1
fidelity home energy inc1
Fidelity Home Energy, Inc1

Common questions

Where does Fidelity Home Energy install solar?

Its installs are spread across 20 counties. The most are in Alameda County (352 installs), followed by Contra Costa County (284).

How often does Fidelity Home Energy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Fidelity Home Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 1,762 interconnected installs with a tariff recorded (1,762) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.