FRANDEZ LLC DBA STEADFAST HOME SOLAR

How many solar installs has FRANDEZ LLC DBA STEADFAST HOME SOLAR done in California, and which license number is on its installs?

FRANDEZ LLC DBA STEADFAST HOME SOLAR has 73 residential solar installs interconnected in California, active in the records from 2022 through 2025 (Oct 19, 2022 to Jun 26, 2025), most of them in Los Angeles County (29), Orange County (25) and San Bernardino County (8). The license number recorded on most of its installs, 1092300, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
73
Last 24 months
5
Total capacity
581.3 kW DC
Median system size
7.2 kW DC
With battery storage
17.8% all time; 40.0% last 24 months
Third-party owned
0.0% of 73 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
24 installs, latest Jun 26, 2025
Ownership types recorded
none recorded
Median battery size
10 kWh (13 installs list a capacity)
First install
Oct 19, 2022
Latest install
Jun 26, 2025
Counties
6
Utilities
SCE 73
CSLB license
1092300

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202210
2023543
2024169
202521
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

24 of its 73 interconnected installs (32.9% of the 73 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 54.2% of those include battery storage. The latest Net Billing Tariff install was approved Jun 26, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04967.1%0 (0.0%)
Net Billing Tariff2432.9%13 (54.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on FRANDEZ LLC DBA STEADFAST HOME SOLAR’s installs. No residential system in the file lists a third-party owner name that matches FRANDEZ LLC DBA STEADFAST HOME SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of FRANDEZ LLC DBA STEADFAST HOME SOLAR’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used modules recorded as Qcells.

In the last 24 months, 5 of FRANDEZ LLC DBA STEADFAST HOME SOLAR’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 60.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of FRANDEZ LLC DBA STEADFAST HOME SOLAR’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 13 battery-paired PG&E and SCE installs (7.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells358
United Renewable Energy1not in top list
Inverter makerEnphase332
Qcells19
Tesla1not in top list
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 72 of 73 installs, inverters on 73. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1092300Not found in the CSLB License Master file pulled Nov 4, 202673

License numbers are the ones the utilities recorded on the interconnection applications (73 of 73 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list FRANDEZ LLC DBA STEADFAST HOME SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County109230011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles29
Orange25
San Bernardino8
Riverside6
Ventura4
Tulare1

Top cities

CityInstalls
Irvine7
Long Beach5
Fullerton3
Glendora2
Harbor City2
Helendale2
La Mirada2
Lake Forest2
Moreno Valley2
Orange2
Seal Beach2
Torrance2
Ventura2
Walnut2
Yorba Linda2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FRANDEZ LLC DBA STEADFAST HOME SOLAR72
FRANDEZ LLC1

Common questions

Where does FRANDEZ LLC DBA STEADFAST HOME SOLAR install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (29 installs), followed by Orange County (25).

How often does FRANDEZ LLC DBA STEADFAST HOME SOLAR install batteries with solar?

17.8% of its interconnected solar installs include battery storage across all years, and 40.0% in the last 24 months (2 of 5).

How many FRANDEZ LLC DBA STEADFAST HOME SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

24 of its 73 interconnected installs (32.9% of the 73 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 54.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.