GREEN INTEGRATIONS AND MANAGEMENT INC

How many solar installs has GREEN INTEGRATIONS AND MANAGEMENT INC done in California, and which license number is on its installs?

GREEN INTEGRATIONS AND MANAGEMENT INC has 303 residential solar installs interconnected in California, active in the records from 2018 through 2026 (May 18, 2018 to Aug 14, 2026), most of them in Los Angeles County (104), Orange County (39) and Alameda County (30). CSLB lists license 1031392 (GREEN INTEGRATIONS AND MANAGEMENT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
303
Last 24 months
25
Total capacity
2,098.1 kW DC
Median system size
6.6 kW DC
With battery storage
17.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 60.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 303 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17 installs, latest Aug 13, 2026
Ownership types recorded
none recorded
Median battery size
14.4 kWh (31 installs list a capacity)
First install
May 18, 2018
Latest install
Aug 14, 2026
Counties
24
Utilities
SCE 189, PGE 109, SDGE 5
CSLB license
1031392

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201830
201910
2020170
2021224
2022529
202315112
20243916
202594
2026 (through Aug 31, 2026)97

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17 of its 303 interconnected installs (5.6% of the 303 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.028694.4%38 (13.5%)
Net Billing Tariff175.6%14 (82.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GREEN INTEGRATIONS AND MANAGEMENT INC’s installs. No residential system in the file lists a third-party owner name that matches GREEN INTEGRATIONS AND MANAGEMENT INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 24 of GREEN INTEGRATIONS AND MANAGEMENT INC’s 25 installs name a module maker in the “Generator Manufacturer” fields, and most of those (21, 87.5%) used modules recorded as REC.

In the last 24 months, 25 of GREEN INTEGRATIONS AND MANAGEMENT INC’s 25 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (22, 88.0%) used inverters recorded as Enphase.

In the last 24 months, 14 of GREEN INTEGRATIONS AND MANAGEMENT INC’s 25 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 71.4%) used batteries recorded as Enphase.

28 of 52 battery-paired PG&E and SCE installs (53.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC21209
Qcells217
NeoVolta Inc.122
Solaria153
Inverter makerEnphase22206
SolarEdge271
NeoVolta Inc.110
SunPower112
Tesla18
Battery makerEnphase1022
Tesla33
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 294 of 303 installs, inverters on 303. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names GREEN INTEGRATIONS AND MANAGEMENT INC as developer on 2 battery storage projects and as installer on 4 (2 name it as both), 4 projects in all with 52 kWh of storage. 1 have the status Paid, with $13,896 in current incentive allocations. Applications were received from Nov 10, 2022 to Nov 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid114$13,896
Pending Reservation228$67,472
Cancelled110$1,456

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU228$67,4720$0
Equity Resiliency114$13,8961$13,896
Small Residential Storage110$1,4560$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1031392GREEN INTEGRATIONS AND MANAGEMENT INC (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorSep 26, 2017Sep 30, 2027302

License numbers are the ones the utilities recorded on the interconnection applications (302 of 303 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1031392. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GREEN INTEGRATIONS AND MANAGEMENT INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
unincorporated San Diego County103139211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles104
Orange39
Alameda30
Santa Clara25
Ventura22
San Mateo15
Riverside13
San Bernardino11
Contra Costa9
San Joaquin7
Santa Barbara5
Sonoma4
Yolo4
Fresno3
El Dorado2
Marin2
Calaveras1
Kings1
Merced1
Monterey1
Napa1
Santa Cruz1
Solano1
Yuba1

Top cities

CityInstalls
Oakland20
San Jose11
Torrance8
Ventura8
Long Beach6
Saugus6
Sunnyvale6
Fullerton5
Redondo Beach5
San Carlos5
Stockton5
Arcadia4
Camarillo4
Costa Mesa4
Hawthorne4

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN INTEGRATIONS AND MANAGEMENT INC296
Green Integrations and Management Inc4
Green Integrations and Management2
Green Integrations and Management Inc.1

Common questions

Where does GREEN INTEGRATIONS AND MANAGEMENT INC install solar?

Its installs are spread across 24 counties. The most are in Los Angeles County (104 installs), followed by Orange County (39).

How often does GREEN INTEGRATIONS AND MANAGEMENT INC install batteries with solar?

17.4% of its interconnected solar installs include battery storage across all years, and 60.0% in the last 24 months (15 of 25). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many GREEN INTEGRATIONS AND MANAGEMENT INC installs are under NEM 3.0 (the Net Billing Tariff)?

17 of its 303 interconnected installs (5.6% of the 303 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.