Herca Solar, Inc.

How many solar installs has Herca Solar, Inc. done in California, and which license number is on its installs?

Herca Solar, Inc. has 618 residential solar installs interconnected in California, active in the records from 2007 through 2016 (May 9, 2007 to May 3, 2016), most of them in San Diego County (425), Riverside County (99) and Orange County (59). The license number recorded on most of its installs, 950771, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
618
Last 24 months
0
Total capacity
4,195.6 kW DC
Median system size
6.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
37.7% of 228 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 85, prepaid lease 1
First install
May 9, 2007
Latest install
May 3, 2016
Counties
6
Utilities
SDGE 449, SCE 169
CSLB license
950771

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200710
200850
200910
2010230
2011420
20121060
20131390
20141300
20151430
2016280
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 618 interconnected installs with a tariff recorded (618) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0618100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 86 of Herca Solar, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 85, prepaid lease 1, other 0. Across all installers, 4 residential systems list a third-party owner name that matches Herca Solar, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sun Power27
SunPower Capital, LLC21
Sun Power Solar Program 1, LLC10
Sun Power Capital, LLC6
Sun Power Solar Program I, LLC6

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 459 of Herca Solar, Inc.’s 618 installs name a module maker in the “Generator Manufacturer” fields, and most of those (258, 56.2%) used modules recorded as SunPower.

Across all years, 518 of Herca Solar, Inc.’s 618 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (131, 25.3%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0258
LG042
AU Optronics038
Axitec035
Canadian Solar035
Inverter makerSunPower0131
SolarEdge0119
SMA0107
ABB050
SolarBridge Technologies043

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 459 of 618 installs, inverters on 518. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
950771Not found in the CSLB License Master file pulled Nov 4, 2026168

License numbers are the ones the utilities recorded on the interconnection applications (168 of 618 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Diego425
Riverside99
Orange59
San Bernardino27
Los Angeles7
Ventura1

Top cities

CityInstalls
San Diego80
Oceanside47
Fallbrook44
Valley Center29
Carlsbad27
Vista25
Poway24
El Cajon23
Escondido22
Murrieta17
Temecula13
La Mesa12
Ramona12
Mission Viejo11
San Marcos11

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Herca Solar, Inc.449
HERCA SOLAR INC97
Herca Solar, Inc45
Herca Solar Inc23
HERCA SOLAR, INC.3
HERCA SOLAR1

Common questions

Where does Herca Solar, Inc. install solar?

Its installs are spread across 6 counties. The most are in San Diego County (425 installs), followed by Riverside County (99).

How often does Herca Solar, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Herca Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 618 interconnected installs with a tariff recorded (618) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.