INTEGRATED TECHNOLOGY ELECTRIC has 126 residential solar installs interconnected in California, active in the records from 2017 through 2022 (Apr 21, 2017 to Nov 2, 2022), most of them in Riverside County (60), San Bernardino County (39) and Orange County (19). CSLB lists license 974125 (INTEGRATED TECHNOLOGY ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
126
Last 24 months
0
Total capacity
1,203.7 kW DC
Median system size
9.5 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.8% of 126 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
prepaid lease 1
First install
Apr 21, 2017
Latest install
Nov 2, 2022
Counties
5
Utilities
SCE 121, SDGE 5
CSLB license
974125

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201770
2018170
2019350
2020230
2021140
2022300
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 126 interconnected installs with a tariff recorded (126) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.021.6%not counted
NEM 2.012498.4%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of INTEGRATED TECHNOLOGY ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches INTEGRATED TECHNOLOGY ELECTRIC exactly.

Third-party owner named on its installsInstalls
Mynt1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 119 of INTEGRATED TECHNOLOGY ELECTRIC’s 126 installs name a module maker in the “Generator Manufacturer” fields, and most of those (86, 72.3%) used modules recorded as Silfab.

Across all years, 126 of INTEGRATED TECHNOLOGY ELECTRIC’s 126 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (100, 79.4%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab086
Qcells018
Solaria04
JinkoSolar03
SolarWorld02
Inverter makerSolarEdge0100
Enphase016
SunPower05
SMA03
APsystems (Altenergy Power System)01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 119 of 126 installs, inverters on 126. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
974125INTEGRATED TECHNOLOGY ELECTRIC INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 20, 2012Oct 31, 2027126

License numbers are the ones the utilities recorded on the interconnection applications (126 of 126 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 974125. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list INTEGRATED TECHNOLOGY ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County97412511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside60
San Bernardino39
Orange19
Los Angeles7
San Diego1

Top cities

CityInstalls
Corona20
Norco10
Murrieta8
Alta Loma5
Highland4
Palm Springs4
San Bernardino4
Eastvale3
Fontana3
Ontario3
Upland3
Yucaipa3
Beaumont2
Capistrano Bch2
Chino2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
INTEGRATED TECHNOLOGY ELECTRIC86
INTEGRATED TECHNOLOGY ELECTRIC INC32
Integrated Technology Electric5
Integrated Technology Electric Inc.2
Integrated technology electric Inc.1

Common questions

Where does INTEGRATED TECHNOLOGY ELECTRIC install solar?

Its installs are spread across 5 counties. The most are in Riverside County (60 installs), followed by San Bernardino County (39).

How often does INTEGRATED TECHNOLOGY ELECTRIC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many INTEGRATED TECHNOLOGY ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 126 interconnected installs with a tariff recorded (126) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.