J P SOLAR SERVICE

How many solar installs has J P SOLAR SERVICE done in California, and which license number is on its installs?

J P SOLAR SERVICE has 42 residential solar installs interconnected in California, active in the records from 2021 through 2023 (Dec 28, 2021 to Dec 7, 2023), most of them in San Joaquin County (5), Contra Costa County (4) and Fresno County (3). CSLB lists license 1082343 (JP SOLAR SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
0
Total capacity
293.3 kW DC
Median system size
6.8 kW DC
With battery storage
4.8% all time; no installs in the last 24 months last 24 months
Third-party owned
2.4% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Dec 7, 2023
Ownership types recorded
other 1
Median battery size
14.7 kWh (2 installs list a capacity)
First install
Dec 28, 2021
Latest install
Dec 7, 2023
Counties
24
Utilities
PGE 42
CSLB license
1082343

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202110
2022321
202391
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 42 interconnected installs (11.9% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 7, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03788.1%2 (5.4%)
Net Billing Tariff511.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of J P SOLAR SERVICE’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches J P SOLAR SERVICE exactly.

Third-party owner named on its installsInstalls
Sungage Finance1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 41 of J P SOLAR SERVICE’s 42 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (19, 46.3%) used modules recorded as Silfab.

Across all years, 42 of J P SOLAR SERVICE’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (31, 73.8%) used inverters recorded as SolarEdge.

Across all years, 2 of J P SOLAR SERVICE’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as LG.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab019
Qcells05
Solaria04
Canadian Solar03
LONGi02
Inverter makerSolarEdge031
Enphase010
Solaria01
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 41 of 42 installs, inverters on 42. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1082343JP SOLAR SERVICES INC (Corporation)CLEARC-46 Solar ContractorOct 11, 2021Sep 30, 202742

License numbers are the ones the utilities recorded on the interconnection applications (42 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1082343. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin5
Contra Costa4
Fresno3
Merced3
San Mateo3
Alameda2
Placer2
Santa Clara2
Solano2
Sonoma2
Butte1
Kern1
Kings1
Madera1
Mendocino1
Monterey1
Nevada1
San Benito1
Santa Barbara1
Stanislaus1
Tehama1
Tulare1
Tuolumne1
Yuba1

Top cities

CityInstalls
Tracy3
Concord2
Merced2
San Mateo2
Stockton2
Auberry1
Bakersfield1
Discovery Bay1
Fairfield1
Fort Bragg1
Fresno1
Granite Bay1
Grass Valley1
Groveland1
Hayward1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
J P SOLAR SERVICE42

Common questions

Where does J P SOLAR SERVICE install solar?

Its installs are spread across 24 counties. The most are in San Joaquin County (5 installs), followed by Contra Costa County (4).

How often does J P SOLAR SERVICE install batteries with solar?

4.8% of its interconnected solar installs include battery storage across all years.

How many J P SOLAR SERVICE installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 42 interconnected installs (11.9% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.