Killion Energy Inc DBA GCI Solar has 261 residential solar installs interconnected in California, active in the records from 2012 through 2014 (Nov 5, 2012 to Jun 27, 2014), most of them in Riverside County (70), Los Angeles County (63) and San Bernardino County (44). The license number recorded on most of its installs, 971660, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
261
Last 24 months
0
Total capacity
1,305.2 kW DC
Median system size
4.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
75.1% of 261 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 188, lease 7, other 1
First install
Nov 5, 2012
Latest install
Jun 27, 2014
Counties
10
Utilities
SCE 255, PGE 6
CSLB license
971660

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201240
20132060
2014510
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 261 interconnected installs with a tariff recorded (261) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0261100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 196 of Killion Energy Inc DBA GCI Solar’s installs the utility recorded a third-party ownership type: PPA 188, lease 7, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Killion Energy Inc DBA GCI Solar exactly.

Third-party owner named on its installsInstalls
GREENDAY FINANCE 1, LLC154
GREENDAY FINANCE I, LLC21
KILOWATT SYSTEMS, LLC6
MYSOLAR I, LLC6
TREDEGAR SOLAR FUND 1, LLC4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 6 of Killion Energy Inc DBA GCI Solar’s 261 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used modules recorded as Sharp.

Across all years, 261 of Killion Energy Inc DBA GCI Solar’s 261 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (257, 98.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp06
Inverter makerEnphase0257
SMA04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 6 of 261 installs, inverters on 261. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
971660Not found in the CSLB License Master file pulled Nov 4, 2026255

License numbers are the ones the utilities recorded on the interconnection applications (255 of 261 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Riverside70
Los Angeles63
San Bernardino44
Tulare30
Orange27
Kern16
Ventura5
Kings3
Fresno2
San Joaquin1

Top cities

CityInstalls
Visalia13
Palmdale11
Temecula10
Palm Springs8
Rancho Mirage8
Tulare7
Hesperia6
Murrieta6
Palm Desert6
Ridgecrest6
Wildomar6
Apple Valley5
Rancho Cucamonga5
Huntington Beach4
Lancaster4

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Killion Energy Inc DBA GCI Solar261

Common questions

Where does Killion Energy Inc DBA GCI Solar install solar?

Its installs are spread across 10 counties. The most are in Riverside County (70 installs), followed by Los Angeles County (63).

How often does Killion Energy Inc DBA GCI Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Killion Energy Inc DBA GCI Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 261 interconnected installs with a tariff recorded (261) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.