Kuykendall Solar
How many solar installs has Kuykendall Solar done in California, and which license number is on its installs?
Kuykendall Solar has 1,241 residential solar installs interconnected in California, active in the records from 2011 through 2024 (Oct 26, 2011 to Feb 6, 2024), most of them in Fresno County (694), Tulare County (189) and Madera County (171). CSLB lists license 775849 (KS ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jan 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 1,241
- Last 24 months
- 0
- Total capacity
- 10,708.1 kW DC
- Median system size
- 8 kW DC
- With battery storage
- 1.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 2.2% of 1,216 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1 installs, latest Oct 24, 2023
- Ownership types recorded
- PPA 26, lease 1
- Median battery size
- 6.6 kWh (2 installs list a capacity)
- First install
- Oct 26, 2011
- Latest install
- Feb 6, 2024
- Counties
- 21
- Utilities
- PGE 1,012, SCE 229
- CSLB license
- 775849
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2011 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2011 | 4 | 0 |
| 2012 | 1 | 0 |
| 2013 | 7 | 0 |
| 2014 | 34 | 0 |
| 2015 | 131 | 0 |
| 2016 | 159 | 0 |
| 2017 | 216 | 0 |
| 2018 | 203 | 0 |
| 2019 | 104 | 0 |
| 2020 | 120 | 2 |
| 2021 | 99 | 4 |
| 2022 | 116 | 6 |
| 2023 | 45 | 1 |
| 2024 | 2 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1 of its 1,241 interconnected installs (0.1% of the 1,241 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 24, 2023.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 347 | 28.0% | not counted |
| NEM 2.0 | 893 | 72.0% | 13 (1.5%) |
| Net Billing Tariff | 1 | 0.1% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 27 of Kuykendall Solar’s installs the utility recorded a third-party ownership type: PPA 26, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Kuykendall Solar exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| OneRoof Energy | 16 |
| ORE Developer Corporate Entity | 6 |
| solkraft | 3 |
| OneRoofEnergy | 1 |
| SUNNOVA HOME SOLAR SERVICE | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 1,191 of Kuykendall Solar’s 1,241 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (352, 29.6%) used modules recorded as Qcells.
Across all years, 1,241 of Kuykendall Solar’s 1,241 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (953, 76.8%) used inverters recorded as SolarEdge.
Across all years, 10 of Kuykendall Solar’s 1,241 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 80.0%) used batteries recorded as Enphase.
10 of 13 battery-paired PG&E and SCE installs (76.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 0 | 352 |
| Canadian Solar | 0 | 229 | |
| LG | 0 | 188 | |
| Mission Solar | 0 | 123 | |
| SolarWorld | 0 | 116 | |
| Inverter maker | SolarEdge | 0 | 953 |
| Enphase | 0 | 231 | |
| Fronius | 0 | 33 | |
| SMA | 0 | 15 | |
| SunPower | 0 | 8 | |
| Battery maker | Enphase | 0 | 8 |
| LG | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,191 of 1,241 installs, inverters on 1,241. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Kuykendall Solar as developer on 4 battery storage projects and as installer on 2 (1 name it as both), 5 projects in all with 564 kWh of storage. 3 have the status Paid, with $220,516 in current incentive allocations. Applications were received from Mar 1, 2019 to Sep 8, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 3 | 530 | $220,516 |
| Reserved | 1 | 15 | $2,250 |
| Cancelled | 1 | 19 | $2,855 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 3 | 37 | $5,685 | 1 | $579 |
| Equity Resiliency | 1 | 26 | $19,937 | 1 | $19,937 |
| Large-Scale Storage | 1 | 500 | $200,000 | 1 | $200,000 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 775849 | KS ELECTRIC (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-46 Solar Contractor | Mar 6, 2000 | Jan 31, 2027 | 1,211 |
License numbers are the ones the utilities recorded on the interconnection applications (1,219 of 1,241 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 775849. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- KS ELECTRIC: 60 installs, license 775849
Counties
| County | Installs |
|---|---|
| Fresno | 694 |
| Tulare | 189 |
| Madera | 171 |
| Kings | 67 |
| Merced | 44 |
| Los Angeles | 21 |
| Kern | 14 |
| Mariposa | 8 |
| Santa Clara | 5 |
| Solano | 5 |
| San Joaquin | 4 |
| Placer | 3 |
| San Francisco | 3 |
| Santa Cruz | 3 |
| Yuba | 3 |
| Riverside | 2 |
| Alameda | 1 |
| Butte | 1 |
| Contra Costa | 1 |
| Monterey | 1 |
| Stanislaus | 1 |
Top cities
| City | Installs |
|---|---|
| Fresno | 349 |
| Clovis | 184 |
| Visalia | 102 |
| Madera | 71 |
| Coarsegold | 65 |
| Sanger | 40 |
| Hanford | 39 |
| Orange Cove | 34 |
| Tulare | 27 |
| Lemoore | 24 |
| Dinuba | 20 |
| Reedley | 20 |
| Merced | 17 |
| Chowchilla | 14 |
| Porterville | 13 |
Names as recorded by the utilities
The utilities recorded this installer under 14 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| KUYKENDALL SOLAR CORPORATION | 627 |
| Kuykendall Solar | 232 |
| Kuykendall Solar Corporation | 187 |
| KUYKENDALL SOLAR CORP | 127 |
| KUYKENDALL SOLAR | 24 |
| Kuykendall Solar Corp | 15 |
| KuyKendall Solar | 10 |
| KUYKENDALL SOLAR CORP. | 8 |
| Kuykendall Solar Corp. | 4 |
| KuyKendall Solar Corporation | 3 |
| Kuykendall solar | 1 |
| kuykendall Solar corp | 1 |
| kuykendall Solar Corp | 1 |
| Kuykendall Solar CorporatioN | 1 |
Common questions
Where does Kuykendall Solar install solar?
Its installs are spread across 21 counties. The most are in Fresno County (694 installs), followed by Tulare County (189).
How often does Kuykendall Solar install batteries with solar?
1.0% of its interconnected solar installs include battery storage across all years.
How many Kuykendall Solar installs are under NEM 3.0 (the Net Billing Tariff)?
1 of its 1,241 interconnected installs (0.1% of the 1,241 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.