LOS ANGELES SOLAR PROS

How many solar installs has LOS ANGELES SOLAR PROS done in California, and which license number is on its installs?

LOS ANGELES SOLAR PROS has 362 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Apr 22, 2021 to Aug 14, 2026), most of them in Los Angeles County (288), Riverside County (19) and San Bernardino County (19). CSLB lists license 1033488 (LOS ANGELES SOLAR PROS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
362
Last 24 months
73
Total capacity
3,843.9 kW DC
Median system size
8.9 kW DC
With battery storage
39.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 81.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.3% of 362 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
126 installs, latest Aug 14, 2026
Ownership types recorded
PPA 1
Median battery size
13.5 kWh (139 installs list a capacity)
First install
Apr 22, 2021
Latest install
Aug 14, 2026
Counties
10
Utilities
SCE 354, PGE 5, SDGE 3
CSLB license
1033488

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021426
20228826
202310018
20246635
20254236
2026 (through Aug 31, 2026)2419

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

126 of its 362 interconnected installs (34.8% of the 362 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 64.8% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.023665.2%59 (25.2%)
Net Billing Tariff12634.8%81 (64.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of LOS ANGELES SOLAR PROS’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches LOS ANGELES SOLAR PROS exactly.

Third-party owner named on its installsInstalls
Goodleap LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 73 of LOS ANGELES SOLAR PROS’ 73 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (22, 30.1%) used modules recorded as Hyundai.

In the last 24 months, 73 of LOS ANGELES SOLAR PROS’ 73 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (32, 43.8%) used inverters recorded as Enphase.

In the last 24 months, 59 of LOS ANGELES SOLAR PROS’ 73 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (51, 86.4%) used batteries recorded as Tesla.

132 of 140 battery-paired PG&E and SCE installs (94.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai2222
Silfab1742
Qcells12199
Aptos Solar10not in top list
SunPower5not in top list
Inverter makerEnphase32176
Tesla2640
APsystems (Altenergy Power System)1819
SunPower536
SolarEdge396
Battery makerTesla51108
Enphase823

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 354 of 362 installs, inverters on 362. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1033488LOS ANGELES SOLAR PROS (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorDec 1, 2017Dec 31, 2027362

License numbers are the ones the utilities recorded on the interconnection applications (362 of 362 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1033488. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles288
Riverside19
San Bernardino19
Orange16
Ventura11
Kern3
San Diego3
Alameda1
Contra Costa1
Santa Barbara1

Top cities

CityInstalls
Chatsworth31
Montebello26
Whittier24
Los Angeles16
Compton13
Altadena9
Irvine9
Simi Valley8
Canyon Country7
Desert Hot Springs7
Downey7
Monterey Park7
Pico Rivera7
San Gabriel7
Santa Clarita7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LOS ANGELES SOLAR PROS359
Los Angeles Solar Pros3

Common questions

Where does LOS ANGELES SOLAR PROS install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (288 installs), followed by Riverside County (19).

How often does LOS ANGELES SOLAR PROS install batteries with solar?

39.0% of its interconnected solar installs include battery storage across all years, and 81.9% in the last 24 months (59 of 72). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many LOS ANGELES SOLAR PROS installs are under NEM 3.0 (the Net Billing Tariff)?

126 of its 362 interconnected installs (34.8% of the 362 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 64.8% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.