Miracle Solar Inc.

How many solar installs has Miracle Solar Inc. done in California, and which license number is on its installs?

Miracle Solar Inc. has 65 residential solar installs interconnected in California, active in the records from 2012 through 2018 (Nov 19, 2012 to Jan 6, 2018), most of them in Los Angeles County (53), Riverside County (4) and San Bernardino County (4). The license number recorded on most of its installs, 973074, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
65
Last 24 months
0
Total capacity
478.4 kW DC
Median system size
7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
36.2% of 47 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 6, lease 9, other 2
First install
Nov 19, 2012
Latest install
Jan 6, 2018
Counties
6
Utilities
SCE 65
CSLB license
973074

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
2013210
2014230
2015110
201660
201720
201810
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06396.9%not counted
NEM 2.023.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 17 of Miracle Solar Inc.’s installs the utility recorded a third-party ownership type: PPA 6, lease 9, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches Miracle Solar Inc. exactly.

Third-party owner named on its installsInstalls
SunPower Capital, LLC8
Kilowatt Systems, LLC5
Sunnova Energy Corporation3
Sunnova Corporation1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 15 of Miracle Solar Inc.’s 65 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (7, 46.7%) used modules recorded as Hyundai.

Across all years, 65 of Miracle Solar Inc.’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (46, 70.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai07
Kyocera04
LG02
Qcells01
SolarWorld01
Inverter makerEnphase046
SolarEdge09
SunPower05
ABB03
SMA02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 15 of 65 installs, inverters on 65. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
973074Not found in the CSLB License Master file pulled Nov 4, 202659

License numbers are the ones the utilities recorded on the interconnection applications (65 of 65 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles53
Riverside4
San Bernardino4
Orange2
Kern1
Ventura1

Top cities

CityInstalls
Valencia10
Castaic8
Lancaster7
Canyon Country5
Santa Clarita3
Acton2
Cerritos2
Chino Hills2
Corona2
Newhall2
Palmdale2
Agoura Hills1
Arcadia1
Calabasas1
Chino1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MIRACLE SOLAR INC34
Miracle Solar Inc.13
Miracle Solar10
Miracle Solar, Inc8

Common questions

Where does Miracle Solar Inc. install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (53 installs), followed by Riverside County (4).

How often does Miracle Solar Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Miracle Solar Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.