Natural Energy has 1,453 residential solar installs interconnected in California, active in the records from 2006 through 2025 (Dec 15, 2006 to Dec 15, 2025), most of them in San Diego County (1,099), Riverside County (165) and Orange County (98). The license number recorded on most of its installs, 481870, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 809349 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jun 30, 2028, recorded on 29 of its installs.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Natural Energy here carry more than one CSLB license number: 481870 on 434 (not found in the CSLB License Master file) and 809349 on 29 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 1,453
- Last 24 months
- 5
- Total capacity
- 7,583.1 kW DC
- Median system size
- 4.7 kW DC
- With battery storage
- 0.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 0.7% of 558 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 3 installs, latest Dec 15, 2025
- Ownership types recorded
- PPA 1, other 3
- Median battery size
- 9.8 kWh (2 installs list a capacity)
- First install
- Dec 15, 2006
- Latest install
- Dec 15, 2025
- Counties
- 7
- Utilities
- SDGE 1,165, SCE 286, PGE 2
- CSLB license
- 481870, 809349
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2006 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2006 | 1 | 0 |
| 2007 | 1 | 0 |
| 2008 | 17 | 0 |
| 2009 | 74 | 0 |
| 2010 | 77 | 0 |
| 2011 | 67 | 0 |
| 2012 | 101 | 0 |
| 2013 | 241 | 0 |
| 2014 | 355 | 0 |
| 2015 | 213 | 0 |
| 2016 | 115 | 0 |
| 2017 | 74 | 0 |
| 2018 | 54 | 1 |
| 2019 | 18 | 1 |
| 2020 | 7 | 0 |
| 2021 | 11 | 0 |
| 2022 | 9 | 0 |
| 2023 | 13 | 0 |
| 2024 | 1 | 0 |
| 2025 | 4 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
3 of its 1,453 interconnected installs (0.2% of the 1,453 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Dec 15, 2025.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 1,224 | 84.2% | not counted |
| NEM 2.0 | 226 | 15.6% | 2 (5.4%) |
| Net Billing Tariff | 3 | 0.2% | not recorded |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 4 of Natural Energy’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 3. Across all installers, 1 residential systems list a third-party owner name that matches Natural Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Kilowatt Systems LLC | 1 |
| Natural Energy | 1 |
| Springer, Richard | 1 |
| Sunnova Energy Corporation | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 5 of Natural Energy’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used modules recorded as SOLAREVERTECNOLOGÃADEAMERICASADECV.
In the last 24 months, 5 of Natural Energy’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.
In the last 24 months, none of Natural Energy’s 5 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.
2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SOLAREVERTECNOLOGÃADEAMERICASADECV | 4 | not in top list |
| Qcells | 1 | 46 | |
| Inverter maker | Enphase | 5 | 916 |
| Battery maker | LG | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,104 of 1,453 installs, inverters on 1,287. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 481870 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 434 | ||||
| 809349 | Sole owner license (name not shown) | CLEAR, Pending Case/CIT| DISC Bond Filed | C-46 Solar Contractor | Jun 12, 2002 | Jun 30, 2028 | 29 |
License numbers are the ones the utilities recorded on the interconnection applications (464 of 1,453 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
CSLB’s License Master file lists a disciplinary bond on license 809349 (bond reason recorded: Conditional), required Apr 27, 2022, $30,000, CSLB case number 2019000123, no cancellation date recorded. CSLB lists license 809349 as a sole owner license (name not shown); the bond is on the license, as CSLB records it. Current CSLB record: 809349.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Local solar permits naming its license
Solar permits in city and county open data that list Natural Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | Total |
|---|---|---|---|---|---|---|
| unincorporated San Diego County | 481870 | 11 | 3 | 3 | 2 | 19 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Natural Energy USA: 164 installs, license 481870
Counties
| County | Installs |
|---|---|
| San Diego | 1,099 |
| Riverside | 165 |
| Orange | 98 |
| Ventura | 38 |
| Los Angeles | 31 |
| San Bernardino | 16 |
| Santa Barbara | 6 |
Top cities
| City | Installs |
|---|---|
| San Diego | 296 |
| Escondido | 135 |
| Carlsbad | 68 |
| Oceanside | 67 |
| Poway | 52 |
| Fallbrook | 50 |
| San Marcos | 49 |
| Vista | 47 |
| El Cajon | 45 |
| Chula Vista | 37 |
| Ramona | 36 |
| Temecula | 29 |
| La Mesa | 28 |
| Encinitas | 27 |
| La Jolla | 26 |
Names as recorded by the utilities
The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Natural Energy | 1,231 |
| NATURAL ENERGY | 168 |
| natural energy | 53 |
| NATURAL ENERGY INC | 1 |
Common questions
Where does Natural Energy install solar?
Its installs are spread across 7 counties. The most are in San Diego County (1,099 installs), followed by Riverside County (165).
How often does Natural Energy install batteries with solar?
0.7% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Natural Energy installs are under NEM 3.0 (the Net Billing Tariff)?
3 of its 1,453 interconnected installs (0.2% of the 1,453 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.