NOVEMBER TECH INC

How many solar installs has NOVEMBER TECH INC done in California, and which license number is on its installs?

NOVEMBER TECH INC has 108 residential solar installs interconnected in California, active in the records from 2023 through 2025 (Oct 24, 2023 to Jun 23, 2025), most of them in Fresno County (56), Kern County (18) and Madera County (7). The license number recorded on most of its installs, 1105344, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
108
Last 24 months
42
Total capacity
874.2 kW DC
Median system size
7.7 kW DC
With battery storage
89.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 97.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 108 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
107 installs, latest Jun 23, 2025
Ownership types recorded
none recorded
Median battery size
13.5 kWh (28 installs list a capacity)
First install
Oct 24, 2023
Latest install
Jun 23, 2025
Counties
13
Utilities
PGE 78, SCE 29, SDGE 1
CSLB license
1105344

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
20231815
20247061
20252020
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

107 of its 108 interconnected installs (99.1% of the 108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 23, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.9%not counted
NEM 2.000.0%0
Net Billing Tariff10799.1%95 (89.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on NOVEMBER TECH INC’s installs. No residential system in the file lists a third-party owner name that matches NOVEMBER TECH INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 36 of NOVEMBER TECH INC’s 42 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (11, 30.6%) used modules recorded as LONGi.

In the last 24 months, 42 of NOVEMBER TECH INC’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (41, 97.6%) used inverters recorded as Enphase.

In the last 24 months, 35 of NOVEMBER TECH INC’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (27, 77.1%) used batteries recorded as Enphase.

75 of 96 battery-paired PG&E and SCE installs (78.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi1112
Qcells910
Trina Solar66
Mission Solar44
JinkoSolar3not in top list
Inverter makerEnphase41100
Tesla811
SolarEdge315
SunPower35
ABB11
Battery makerEnphase2756
Tesla817

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 85 of 108 installs, inverters on 108. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1105344Not found in the CSLB License Master file pulled Nov 4, 2026108

License numbers are the ones the utilities recorded on the interconnection applications (108 of 108 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list NOVEMBER TECH INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County110534411

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Fresno56
Kern18
Madera7
Riverside7
Tulare4
Los Angeles3
San Bernardino3
Ventura3
Merced2
San Luis Obispo2
Kings1
Nevada1
San Diego1

Top cities

CityInstalls
Fresno45
Bakersfield8
Clovis7
Tehachapi6
Madera5
Lake Elsinore2
Oakhurst2
Parlier2
Simi Valley2
Visalia2
Bodfish1
Compton1
Corona1
Covina1
Eastvale1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NOVEMBER TECH INC107
November Tech Inc1

Common questions

Where does NOVEMBER TECH INC install solar?

Its installs are spread across 13 counties. The most are in Fresno County (56 installs), followed by Kern County (18).

How often does NOVEMBER TECH INC install batteries with solar?

89.7% of its interconnected solar installs include battery storage across all years, and 97.6% in the last 24 months (41 of 42). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many NOVEMBER TECH INC installs are under NEM 3.0 (the Net Billing Tariff)?

107 of its 108 interconnected installs (99.1% of the 108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.