NOVEMBER TECH INC
How many solar installs has NOVEMBER TECH INC done in California, and which license number is on its installs?
NOVEMBER TECH INC has 108 residential solar installs interconnected in California, active in the records from 2023 through 2025 (Oct 24, 2023 to Jun 23, 2025), most of them in Fresno County (56), Kern County (18) and Madera County (7). The license number recorded on most of its installs, 1105344, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 108
- Last 24 months
- 42
- Total capacity
- 874.2 kW DC
- Median system size
- 7.7 kW DC
- With battery storage
- 89.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 97.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 0.0% of 108 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 107 installs, latest Jun 23, 2025
- Ownership types recorded
- none recorded
- Median battery size
- 13.5 kWh (28 installs list a capacity)
- First install
- Oct 24, 2023
- Latest install
- Jun 23, 2025
- Counties
- 13
- Utilities
- PGE 78, SCE 29, SDGE 1
- CSLB license
- 1105344
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2023 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2023 | 18 | 15 |
| 2024 | 70 | 61 |
| 2025 | 20 | 20 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
107 of its 108 interconnected installs (99.1% of the 108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 23, 2025.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 1 | 0.9% | not counted |
| NEM 2.0 | 0 | 0.0% | 0 |
| Net Billing Tariff | 107 | 99.1% | 95 (89.6%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on NOVEMBER TECH INC’s installs. No residential system in the file lists a third-party owner name that matches NOVEMBER TECH INC exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 36 of NOVEMBER TECH INC’s 42 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (11, 30.6%) used modules recorded as LONGi.
In the last 24 months, 42 of NOVEMBER TECH INC’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (41, 97.6%) used inverters recorded as Enphase.
In the last 24 months, 35 of NOVEMBER TECH INC’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (27, 77.1%) used batteries recorded as Enphase.
75 of 96 battery-paired PG&E and SCE installs (78.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | LONGi | 11 | 12 |
| Qcells | 9 | 10 | |
| Trina Solar | 6 | 6 | |
| Mission Solar | 4 | 4 | |
| JinkoSolar | 3 | not in top list | |
| Inverter maker | Enphase | 41 | 100 |
| Tesla | 8 | 11 | |
| SolarEdge | 3 | 15 | |
| SunPower | 3 | 5 | |
| ABB | 1 | 1 | |
| Battery maker | Enphase | 27 | 56 |
| Tesla | 8 | 17 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 85 of 108 installs, inverters on 108. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1105344 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 108 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (108 of 108 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list NOVEMBER TECH INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2024 | Total |
|---|---|---|---|
| unincorporated San Diego County | 1105344 | 1 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| Fresno | 56 |
| Kern | 18 |
| Madera | 7 |
| Riverside | 7 |
| Tulare | 4 |
| Los Angeles | 3 |
| San Bernardino | 3 |
| Ventura | 3 |
| Merced | 2 |
| San Luis Obispo | 2 |
| Kings | 1 |
| Nevada | 1 |
| San Diego | 1 |
Top cities
| City | Installs |
|---|---|
| Fresno | 45 |
| Bakersfield | 8 |
| Clovis | 7 |
| Tehachapi | 6 |
| Madera | 5 |
| Lake Elsinore | 2 |
| Oakhurst | 2 |
| Parlier | 2 |
| Simi Valley | 2 |
| Visalia | 2 |
| Bodfish | 1 |
| Compton | 1 |
| Corona | 1 |
| Covina | 1 |
| Eastvale | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| NOVEMBER TECH INC | 107 |
| November Tech Inc | 1 |
Common questions
Where does NOVEMBER TECH INC install solar?
Its installs are spread across 13 counties. The most are in Fresno County (56 installs), followed by Kern County (18).
How often does NOVEMBER TECH INC install batteries with solar?
89.7% of its interconnected solar installs include battery storage across all years, and 97.6% in the last 24 months (41 of 42). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many NOVEMBER TECH INC installs are under NEM 3.0 (the Net Billing Tariff)?
107 of its 108 interconnected installs (99.1% of the 108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.