OneRoof Energy, Inc.

How many solar installs has OneRoof Energy, Inc. done in California, and which license number is on its installs?

OneRoof Energy, Inc. has 71 residential solar installs interconnected in California, active in the records from 2014 through 2017 (Jul 28, 2014 to Apr 3, 2017), most of them in San Diego County (45), Orange County (13) and Contra Costa County (5). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
71
Last 24 months
0
Total capacity
365.1 kW DC
Median system size
4.5 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
76.8% of 56 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 43
First install
Jul 28, 2014
Latest install
Apr 3, 2017
Counties
11
Utilities
SDGE 58, PGE 10, SCE 3
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014120
2015360
2016220
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 71 interconnected installs with a tariff recorded (71) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07098.6%not counted
NEM 2.011.4%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 43 of OneRoof Energy, Inc.’s installs the utility recorded a third-party ownership type: PPA 43, lease 0, prepaid lease 0, other 0. Across all installers, 126 residential systems list a third-party owner name that matches OneRoof Energy, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
OneRoof Energy42
One Roof Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 68 of OneRoof Energy, Inc.’s 71 installs name a module maker in the “Generator Manufacturer” fields, and most of those (50, 73.5%) used modules recorded as Qcells.

Across all years, 71 of OneRoof Energy, Inc.’s 71 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (58, 81.7%) used inverters recorded as Fronius.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells050
Trina Solar015
Astronergy (Chint)02
JinkoSolar01
Inverter makerFronius058
Enphase013

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 68 of 71 installs, inverters on 71. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (18 of 71 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
San Diego45
Orange13
Contra Costa5
Kern1
Los Angeles1
Mendocino1
San Francisco1
Solano1
Sutter1
Ventura1
Yuba1

Top cities

CityInstalls
San Diego15
Ramona8
Chula Vista5
San Clemente5
El Cajon4
Vista4
Escondido3
Antioch2
Concord2
Encinitas2
Lemon Grove2
Santee2
Spring Valley2
Bonita1
Brentwood1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
OneRoof Energy, Inc.65
OneRoof Energy Inc4
ONEROOF ENERGY INC1
ONEROOF ENERGY, INC1

Common questions

Where does OneRoof Energy, Inc. install solar?

Its installs are spread across 11 counties. The most are in San Diego County (45 installs), followed by Orange County (13).

How often does OneRoof Energy, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many OneRoof Energy, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 71 interconnected installs with a tariff recorded (71) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.