R C I SOLAR ELECTRIC

How many solar installs has R C I SOLAR ELECTRIC done in California, and which license number is on its installs?

R C I SOLAR ELECTRIC has 105 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 14, 2019 to Apr 21, 2026), most of them in San Joaquin County (41), Placer County (11) and Contra Costa County (10). CSLB lists license 1014421 (R C I SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
105
Last 24 months
16
Total capacity
862.3 kW DC
Median system size
6.7 kW DC
With battery storage
11.4% all time; 50.0% last 24 months
Third-party owned
0.0% of 105 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
22 installs, latest Apr 21, 2026
Ownership types recorded
none recorded
Median battery size
27 kWh (1 installs list a capacity)
First install
Oct 14, 2019
Latest install
Apr 21, 2026
Counties
15
Utilities
PGE 105
CSLB license
1014421

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201990
2020230
2021110
2022230
2023151
2024127
202564
2026 (through Aug 31, 2026)60

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

22 of its 105 interconnected installs (21.0% of the 105 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 54.5% of those include battery storage. The latest Net Billing Tariff install was approved Apr 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08379.0%0 (0.0%)
Net Billing Tariff2221.0%12 (54.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on R C I SOLAR ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches R C I SOLAR ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 16 of R C I SOLAR ELECTRIC’s 16 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 31.3%) used modules recorded as Znshine.

In the last 24 months, 16 of R C I SOLAR ELECTRIC’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 81.3%) used inverters recorded as Tesla.

In the last 24 months, 8 of R C I SOLAR ELECTRIC’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 100.0%) used batteries recorded as Tesla.

12 of 12 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine527
Philadelphia Solar3not in top list
Trina Solar3not in top list
Phono Solar Technology29
SOLAREVER TECNOLOGIA DE AMERICA SA DE CV2not in top list
Inverter makerTesla1313
SolarEdge270
Enphase110
SMA13
Battery makerTesla88

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 105 of 105 installs, inverters on 105. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1014421R C I SOLAR ELECTRIC (Corporation)CLEARC-10 Electrical ContractorMay 20, 2016May 31, 2028105

License numbers are the ones the utilities recorded on the interconnection applications (105 of 105 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1014421. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin41
Placer11
Contra Costa10
Amador9
El Dorado7
Calaveras6
Tuolumne6
Yolo6
Solano3
Colusa1
Merced1
Monterey1
Sacramento1
Sutter1
Yuba1

Top cities

CityInstalls
Stockton15
Acampo8
Granite Bay6
Lodi5
Tracy5
Brentwood4
Pioneer4
El Dorado Hills3
Manteca3
Placerville3
Sonora3
Woodland3
Copperopolis2
Discovery Bay2
Galt2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
R C I SOLAR ELECTRIC105

Common questions

Where does R C I SOLAR ELECTRIC install solar?

Its installs are spread across 15 counties. The most are in San Joaquin County (41 installs), followed by Placer County (11).

How often does R C I SOLAR ELECTRIC install batteries with solar?

11.4% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (8 of 16).

How many R C I SOLAR ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

22 of its 105 interconnected installs (21.0% of the 105 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 54.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.