How many solar installs has RCI Solar done in California, and which license number is on its installs?

RCI Solar has 195 residential solar installs interconnected in California, active in the records from 2014 through 2024 (Jun 25, 2014 to Sep 18, 2024), most of them in San Joaquin County (46), Yolo County (22) and Placer County (19). CSLB lists license 1014421 (R C I SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to RCI Solar here carry more than one CSLB license number: 1014421 on 114 (CSLB holder R C I SOLAR ELECTRIC, Herald) and 871502 on 77 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
195
Last 24 months
1
Total capacity
1,451.7 kW DC
Median system size
6.7 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 195 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Apr 5, 2024
Ownership types recorded
none recorded
First install
Jun 25, 2014
Latest install
Sep 18, 2024
Counties
24
Utilities
PGE 194, SCE 1
CSLB license
1014421, 871502

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014160
2015380
2016430
2017410
2018380
2019160
202000
202100
202200
202300
202430
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 195 interconnected installs (0.5% of the 195 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 5, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09850.3%not counted
NEM 2.09649.2%0 (0.0%)
Net Billing Tariff10.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on RCI Solar’s installs. No residential system in the file lists a third-party owner name that matches RCI Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of RCI Solar’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Solaria.

In the last 24 months, 1 of RCI Solar’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolaria1not in top list
Inverter makerSolarEdge172

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 194 of 195 installs, inverters on 195. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names RCI Solar as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 27 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 13, 2023 to Aug 13, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
RRF Rejected127$4,080

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated127$4,0800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1014421R C I SOLAR ELECTRIC (Corporation)CLEARC-10 Electrical ContractorMay 20, 2016May 31, 2028114
871502Not found in the CSLB License Master file pulled Nov 4, 202677

License numbers are the ones the utilities recorded on the interconnection applications (194 of 195 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1014421. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin46
Yolo22
Placer19
El Dorado17
Calaveras15
Contra Costa12
Solano11
Tuolumne9
Amador7
Stanislaus7
Sutter5
Yuba5
Sacramento3
Santa Clara3
Butte2
Colusa2
Fresno2
Glenn2
Alameda1
Merced1
Napa1
San Mateo1
Sonoma1
Tulare1

Top cities

CityInstalls
Stockton14
Woodland10
El Dorado Hills8
Lincoln8
Acampo7
Vacaville7
Davis6
Granite Bay6
Lodi6
Valley Springs6
Copperopolis5
Manteca5
Sonora5
West Sacramento5
Yuba City5

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RCI SOLAR114
RCI SOLAR INC38
RCI Solar27
RCI SOLAR INC.10
RCI Solar Inc3
rci solar2
RCI Solar Inc.1

Common questions

Where does RCI Solar install solar?

Its installs are spread across 24 counties. The most are in San Joaquin County (46 installs), followed by Yolo County (22).

How often does RCI Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many RCI Solar installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 195 interconnected installs (0.5% of the 195 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.