Rancho Solar Inc.

How many solar installs has Rancho Solar Inc. done in California, and which license number is on its installs?

Rancho Solar Inc. has 471 residential solar installs interconnected in California, active in the records from 2009 through 2026 (May 5, 2009 to Jun 29, 2026), most of them in San Diego County (449), Orange County (14) and Riverside County (8). CSLB lists license 926946 (RANCHO ELECTRICAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
471
Last 24 months
24
Total capacity
3,842.3 kW DC
Median system size
7.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 329 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
25 installs, latest Jun 29, 2026
Ownership types recorded
none recorded
First install
May 5, 2009
Latest install
Jun 29, 2026
Counties
3
Utilities
SDGE 461, SCE 10
CSLB license
926946

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200960
2010130
2011120
201290
2013390
2014560
2015570
2016100
2017370
2018500
2019460
2020140
2021240
2022320
2023340
2024120
2025180
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

25 of its 471 interconnected installs (5.3% of the 471 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jun 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.019240.8%not counted
NEM 2.025453.9%0 (0.0%)
Net Billing Tariff255.3%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Rancho Solar Inc.’s installs. No residential system in the file lists a third-party owner name that matches Rancho Solar Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 18 of Rancho Solar Inc.’s 24 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 50.0%) used modules recorded as Silfab.

In the last 24 months, 24 of Rancho Solar Inc.’s 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 83.3%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab9not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.4not in top list
Qcells494
Hyundai1not in top list
Inverter makerTesla2022
Enphase578
SMA192
SolarEdge1224

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 422 of 471 installs, inverters on 445. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
926946RANCHO ELECTRICAL (Corporation)CLEARC-10 Electrical ContractorJan 6, 2009Jan 31, 2027287

License numbers are the ones the utilities recorded on the interconnection applications (287 of 471 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 926946. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Rancho Solar Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County92694611133661135159

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego449
Orange14
Riverside8

Top cities

CityInstalls
San Diego141
Poway76
Escondido30
El Cajon28
Vista24
Rancho Santa Fe19
Lakeside14
Fallbrook13
Oceanside13
Encinitas12
Santee12
Carlsbad11
La Jolla11
San Marcos9
Imperial Beach7

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Rancho Solar Inc.420
Rancho Solar, Inc.40
RANCHO SOLAR INC8
RANCHO SOLAR INC.2
Rancho Solar1

Common questions

Where does Rancho Solar Inc. install solar?

Its installs are spread across 3 counties. The most are in San Diego County (449 installs), followed by Orange County (14).

How often does Rancho Solar Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Rancho Solar Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

25 of its 471 interconnected installs (5.3% of the 471 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.