S3C ENERGY CONSTRUCTION INC

How many solar installs has S3C ENERGY CONSTRUCTION INC done in California, and which license number is on its installs?

S3C ENERGY CONSTRUCTION INC has 61 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Jun 13, 2024 to Jul 27, 2026), most of them in Orange County (22), Los Angeles County (16) and Riverside County (7). CSLB lists license 1112375 (S3C ENERGY CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
54
Total capacity
596.6 kW DC
Median system size
8.5 kW DC
With battery storage
100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.6% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
61 installs, latest Jul 27, 2026
Ownership types recorded
lease 1
Median battery size
13.5 kWh (47 installs list a capacity)
First install
Jun 13, 2024
Latest install
Jul 27, 2026
Counties
12
Utilities
SCE 47, PGE 10, SDGE 4
CSLB license
1112375

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20241716
20252623
2026 (through Aug 31, 2026)1818

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

61 of its 61 interconnected installs (100.0% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff61100.0%57 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of S3C ENERGY CONSTRUCTION INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches S3C ENERGY CONSTRUCTION INC exactly.

Third-party owner named on its installsInstalls
LightReach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 54 of S3C ENERGY CONSTRUCTION INC’s 54 installs name a module maker in the “Generator Manufacturer” fields, and most of those (33, 61.1%) used modules recorded as LONGi.

In the last 24 months, 54 of S3C ENERGY CONSTRUCTION INC’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (31, 57.4%) used inverters recorded as Tesla.

In the last 24 months, 51 of S3C ENERGY CONSTRUCTION INC’s 54 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (29, 56.9%) used batteries recorded as Tesla.

57 of 57 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi3334
Qcells99
JA Solar77
JinkoSolar45
Canadian Solar16
Inverter makerTesla3131
Enphase2330
Battery makerTesla2930
Enphase2227

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1112375S3C ENERGY CONSTRUCTION INC (Corporation)CLEAR, WC Susp PendingB General Building ContractorNov 7, 2023Nov 30, 202761

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1112375. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list S3C ENERGY CONSTRUCTION INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County111237522

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange22
Los Angeles16
Riverside7
Contra Costa3
San Diego3
San Mateo3
San Bernardino2
Alameda1
Placer1
Santa Clara1
Solano1
Ventura1

Top cities

CityInstalls
Buena Park6
Long Beach4
Murrieta3
Brentwood2
Carson2
Eastvale2
Fullerton2
Hesperia2
Mission Viejo2
Yorba Linda2
Aliso Viejo1
Bonsall1
Canyon Country1
Corona1
Covina1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
S3C ENERGY CONSTRUCTION INC61

Common questions

Where does S3C ENERGY CONSTRUCTION INC install solar?

Its installs are spread across 12 counties. The most are in Orange County (22 installs), followed by Los Angeles County (16).

How often does S3C ENERGY CONSTRUCTION INC install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (51 of 51). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many S3C ENERGY CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

61 of its 61 interconnected installs (100.0% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.