Sol Reliable

How many solar installs has Sol Reliable done in California, and which license number is on its installs?

Sol Reliable has 184 residential solar installs interconnected in California, active in the records from 2013 through 2023 (Sep 23, 2013 to Sep 27, 2023), most of them in Los Angeles County (101), Orange County (20) and Ventura County (18). The license number recorded on most of its installs, 842003, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
184
Last 24 months
0
Total capacity
1,049.1 kW DC
Median system size
4.7 kW DC
With battery storage
2.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
19.0% of 116 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2, lease 20
Median battery size
13.5 kWh (5 installs list a capacity)
First install
Sep 23, 2013
Latest install
Sep 27, 2023
Counties
14
Utilities
SCE 158, PGE 13, SDGE 13
CSLB license
842003

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201360
2014580
2015460
2016290
2017130
2018221
201942
202000
202100
202210
202352
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 184 interconnected installs with a tariff recorded (184) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.014779.9%not counted
NEM 2.03720.1%5 (20.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 22 of Sol Reliable’s installs the utility recorded a third-party ownership type: PPA 2, lease 20, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sol Reliable exactly.

Third-party owner named on its installsInstalls
SunPower11
SunPower Capital, LLC7
Sun Power Capital, LLC3
Solar Own1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 98 of Sol Reliable’s 184 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (30, 30.6%) used modules recorded as SunPower.

Across all years, 184 of Sol Reliable’s 184 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (83, 45.1%) used inverters recorded as Enphase.

Across all years, 5 of Sol Reliable’s 184 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used batteries recorded as Tesla.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower030
SolarWorld027
Panasonic018
Sun Edison09
REC04
Inverter makerEnphase083
SMA041
SolarEdge041
SunPower010
Power-One07
Battery makerTesla03
SolarEdge02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 98 of 184 installs, inverters on 184. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sol Reliable as developer on 70 battery storage projects and as installer on 5 (5 name it as both), 70 projects in all with 1,184 kWh of storage. 48 have the status Paid, with $282,234 in current incentive allocations. Applications were received from May 1, 2017 to Jan 19, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid48793$282,234
Cancelled22391$153,319

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage681,145$411,43047$265,025
Equity Resiliency119$17,2091$17,209
Large-Scale Storage119$6,9140$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
842003Not found in the CSLB License Master file pulled Nov 4, 2026182

License numbers are the ones the utilities recorded on the interconnection applications (183 of 184 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles101
Orange20
Ventura18
San Bernardino12
San Diego11
Riverside9
Alameda3
San Francisco3
Contra Costa2
Kern1
Kings1
Napa1
San Mateo1
Solano1

Top cities

CityInstalls
Lancaster7
Glendora6
Monrovia6
Saugus5
Valencia5
Camarillo4
Corona4
Long Beach4
San Diego4
San Fernando4
Alta Loma3
Buena Park3
Canyon Country3
Covina3
Lakewood3

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOL RELIABLE83
Sol Reliable53
SOL RELIABLE INC25
Sol Reliable, Inc12
Sol Reliable Inc9
Sol reliable1
Sol Reliable Inc.1

Common questions

Where does Sol Reliable install solar?

Its installs are spread across 14 counties. The most are in Los Angeles County (101 installs), followed by Orange County (20).

How often does Sol Reliable install batteries with solar?

2.9% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sol Reliable installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 184 interconnected installs with a tariff recorded (184) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.