SOLAR CENTURY

How many solar installs has SOLAR CENTURY done in California, and which license number is on its installs?

SOLAR CENTURY has 39 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 8, 2021 to Mar 17, 2026), most of them in Placer County (13), Yolo County (7) and Contra Costa County (5). CSLB lists license 1007296 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
9
Total capacity
262.8 kW DC
Median system size
6.6 kW DC
With battery storage
32.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 39 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Feb 23, 2026
Ownership types recorded
none recorded
Median battery size
1 kWh (7 installs list a capacity)
First install
Mar 8, 2021
Latest install
Mar 17, 2026
Counties
10
Utilities
PGE 34, SDGE 5
CSLB license
1007296

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202180
202260
2023130
202432
202577
2026 (through Aug 31, 2026)22

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 39 interconnected installs (30.8% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest Net Billing Tariff install was approved Feb 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02769.2%1 (4.5%)
Net Billing Tariff1230.8%10 (83.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOLAR CENTURY’s installs. No residential system in the file lists a third-party owner name that matches SOLAR CENTURY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of SOLAR CENTURY’s 9 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 55.6%) used modules recorded as REC.

In the last 24 months, 9 of SOLAR CENTURY’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 100.0%) used inverters recorded as Tesla.

In the last 24 months, 9 of SOLAR CENTURY’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used batteries recorded as Tesla.

11 of 11 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC511
Qcells24
Hyundai13
LONGi1not in top list
Trina Solar1not in top list
Inverter makerTesla99
Enphase332
Battery makerTesla99

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 39 installs, inverters on 39. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1007296Sole owner license (name not shown)CLEARC-46 Solar ContractorSep 14, 2015Sep 30, 202839

License numbers are the ones the utilities recorded on the interconnection applications (39 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1007296. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer13
Yolo7
Contra Costa5
El Dorado5
San Diego3
Orange2
Marin1
Napa1
San Mateo1
Sonoma1

Top cities

CityInstalls
Rocklin8
West Sacramento6
Granite Bay5
El Dorado Hills4
Walnut Creek4
Laguna Hills2
Mission Viejo2
Belmont1
Bodega Bay1
Davis1
Martinez1
Napa1
San Diego1
San Rafael1
Shingle Springs1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR CENTURY32
solar century7

Common questions

Where does SOLAR CENTURY install solar?

Its installs are spread across 10 counties. The most are in Placer County (13 installs), followed by Yolo County (7).

How often does SOLAR CENTURY install batteries with solar?

32.4% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (9 of 9). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOLAR CENTURY installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 39 interconnected installs (30.8% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.