SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR

How many solar installs has SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR done in California, and which license number is on its installs?

SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR has 140 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Nov 8, 2021 to Mar 23, 2026), most of them in San Bernardino County (72), Riverside County (58) and Orange County (7). CSLB lists license 1074301 (SUN DOLLAR SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
140
Last 24 months
21
Total capacity
1,437.6 kW DC
Median system size
10 kW DC
With battery storage
22.9% all time; 85.7% last 24 months
Third-party owned
0.7% of 140 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
27 installs, latest Mar 23, 2026
Ownership types recorded
PPA 1
Median battery size
13.5 kWh (32 installs list a capacity)
First install
Nov 8, 2021
Latest install
Mar 23, 2026
Counties
5
Utilities
SCE 140
CSLB license
1074301

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202140
2022547
2023501
2024169
202576
2026 (through Aug 31, 2026)99

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

27 of its 140 interconnected installs (19.3% of the 140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.9% of those include battery storage. The latest Net Billing Tariff install was approved Mar 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011380.7%8 (7.1%)
Net Billing Tariff2719.3%24 (88.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Solar Repair Center DBA Sun Dollar Solar1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 21 of SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR’s 21 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (10, 47.6%) used modules recorded as Aptos Solar.

In the last 24 months, 21 of SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR’s 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 38.1%) used inverters recorded as Tesla.

In the last 24 months, 16 of SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR’s 21 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (8, 50.0%) used batteries recorded as Tesla.

21 of 32 battery-paired PG&E and SCE installs (65.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar1020
Axitec711
Qcells399
Hyundai1not in top list
Point Guard Energy1not in top list
Inverter makerTesla811
Enphase758
PointGuard Energy Inc.55
POMCube Inc.1not in top list
Battery makerTesla88
Enphase49
PointGuard Energy Inc.44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 134 of 140 installs, inverters on 140. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1074301SUN DOLLAR SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorMar 26, 2021Mar 31, 2027140

License numbers are the ones the utilities recorded on the interconnection applications (140 of 140 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1074301. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County107430111

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino72
Riverside58
Orange7
Los Angeles2
Ventura1

Top cities

CityInstalls
Beaumont27
Yucaipa20
Redlands16
Cherry Valley7
Highland6
Yucca Valley6
Temecula4
Upland4
Garden Grove3
Menifee3
Norco3
San Bernardino3
Alta Loma2
Apple Valley2
Calimesa2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR138
SOLAR REPAIR_CENTER INC2

Common questions

Where does SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR install solar?

Its installs are spread across 5 counties. The most are in San Bernardino County (72 installs), followed by Riverside County (58).

How often does SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR install batteries with solar?

22.9% of its interconnected solar installs include battery storage across all years, and 85.7% in the last 24 months (18 of 21).

How many SOLAR REPAIR_CENTER INC DBA SUN DOLLAR SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

27 of its 140 interconnected installs (19.3% of the 140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.