SUNFIRE CONSTRUCTION INC has 429 residential solar installs interconnected in California, active in the records from 2021 through 2026 (May 12, 2021 to Aug 19, 2026), most of them in Riverside County (231), San Bernardino County (100) and Los Angeles County (39). CSLB lists license 1073195 (SUNFIRE CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, D-12, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
429
Last 24 months
60
Total capacity
4,386.8 kW DC
Median system size
8.4 kW DC
With battery storage
25.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 87.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.4% of 429 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
115 installs, latest Aug 19, 2026
Ownership types recorded
PPA 5, other 1
Median battery size
13.5 kWh (101 installs list a capacity)
First install
May 12, 2021
Latest install
Aug 19, 2026
Counties
9
Utilities
SCE 401, SDGE 27, PGE 1
CSLB license
1073195

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021190
2022840
20232047
20249168
20252420
2026 (through Aug 31, 2026)76

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

115 of its 429 interconnected installs (26.8% of the 429 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.2% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.031473.2%6 (2.0%)
Net Billing Tariff11526.8%95 (87.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 6 of SUNFIRE CONSTRUCTION INC’s installs the utility recorded a third-party ownership type: PPA 5, lease 0, prepaid lease 0, other 1. Across all installers, 5 residential systems list a third-party owner name that matches SUNFIRE CONSTRUCTION INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SUNFIRE CONSTRUCTION INC5
SUNNOVA1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 60 of SUNFIRE CONSTRUCTION INC’s 60 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (26, 43.3%) used modules recorded as Qcells.

In the last 24 months, 60 of SUNFIRE CONSTRUCTION INC’s 60 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (37, 61.7%) used inverters recorded as Enphase.

In the last 24 months, 49 of SUNFIRE CONSTRUCTION INC’s 60 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (26, 53.1%) used batteries recorded as Tesla.

100 of 101 battery-paired PG&E and SCE installs (99.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells26293
SEG Solar14not in top list
LONGi1316
JA Solar3not in top list
Waaree318
Inverter makerEnphase37245
Tesla2241
SolarEdge3102
Delta Electronics14
Fronius1not in top list
Battery makerTesla2639
Enphase1423
SunPower526
FranklinWH311
sonnen11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 418 of 429 installs, inverters on 429. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUNFIRE CONSTRUCTION INC as developer on 1 battery storage project and as installer on 0 (0 name it as both), 1 projects in all with 40 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Nov 8, 2023 to Nov 8, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled140$39,600

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency140$39,6000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1073195SUNFIRE CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; D-12Feb 4, 2021Feb 28, 2027429

License numbers are the ones the utilities recorded on the interconnection applications (429 of 429 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1073195. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUNFIRE CONSTRUCTION INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202220232026Total
unincorporated San Diego County10731954217

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside231
San Bernardino100
Los Angeles39
Orange37
San Diego17
Ventura2
Kern1
Merced1
Tulare1

Top cities

CityInstalls
Moreno Valley48
Corona30
Perris27
Riverside17
Lake Elsinore16
Hemet11
Highland11
San Bernardino11
Victorville11
Fontana8
San Jacinto8
Temecula8
Menifee7
Redlands7
San Diego7

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNFIRE CONSTRUCTION INC402
Sunfire Construction Inc23
Sunfire Construction4

Common questions

Where does SUNFIRE CONSTRUCTION INC install solar?

Its installs are spread across 9 counties. The most are in Riverside County (231 installs), followed by San Bernardino County (100).

How often does SUNFIRE CONSTRUCTION INC install batteries with solar?

25.1% of its interconnected solar installs include battery storage across all years, and 87.5% in the last 24 months (49 of 56). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUNFIRE CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

115 of its 429 interconnected installs (26.8% of the 429 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.2% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources