SUNRIVER SOLAR POWER SYSTEMS

How many solar installs has SUNRIVER SOLAR POWER SYSTEMS done in California, and which license number is on its installs?

SUNRIVER SOLAR POWER SYSTEMS has 573 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Oct 9, 2019 to Nov 20, 2025), most of them in Placer County (200), Nevada County (127) and Yolo County (85). CSLB lists license 970886 (SUNRIVER SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
573
Last 24 months
37
Total capacity
4,867.5 kW DC
Median system size
7.8 kW DC
With battery storage
18.0% all time; 62.2% last 24 months
Third-party owned
0.0% of 573 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
75 installs, latest Nov 20, 2025
Ownership types recorded
none recorded
Median battery size
13.5 kWh (22 installs list a capacity)
First install
Oct 9, 2019
Latest install
Nov 20, 2025
Counties
15
Utilities
PGE 573
CSLB license
970886

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019110
2020493
2021856
202212619
202321712
20246252
20252311
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

75 of its 573 interconnected installs (13.1% of the 573 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.7% of those include battery storage. The latest Net Billing Tariff install was approved Nov 20, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.040.7%not counted
NEM 2.049486.2%38 (7.7%)
Net Billing Tariff7513.1%62 (82.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUNRIVER SOLAR POWER SYSTEMS’s installs. No residential system in the file lists a third-party owner name that matches SUNRIVER SOLAR POWER SYSTEMS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 21 of SUNRIVER SOLAR POWER SYSTEMS’ 37 installs name a module maker in the “Generator Manufacturer” fields, and most of those (18, 85.7%) used modules recorded as Qcells.

In the last 24 months, 37 of SUNRIVER SOLAR POWER SYSTEMS’ 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 54.1%) used inverters recorded as Enphase.

In the last 24 months, 14 of SUNRIVER SOLAR POWER SYSTEMS’ 37 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (11, 78.6%) used batteries recorded as Tesla.

80 of 103 battery-paired PG&E and SCE installs (77.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells18467
JA Solar13
LONGi1not in top list
Znshine13
Inverter makerEnphase20499
Tesla2034
SMA413
Fronius2not in top list
PV Powered2not in top list
Battery makerTesla1124
Enphase350

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 507 of 573 installs, inverters on 573. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUNRIVER SOLAR POWER SYSTEMS as developer on 0 battery storage projects and as installer on 8 (0 name it as both), 8 projects in all with 116 kWh of storage. 5 have the status Paid, with $68,600 in current incentive allocations. Applications were received from Jul 10, 2020 to Apr 3, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid577$68,600
Cancelled340$28,286

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency694$93,4784$67,172
Small Residential Storage223$3,4081$1,428

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970886SUNRIVER SOLAR INC (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorMar 14, 2012Mar 31, 2028572

License numbers are the ones the utilities recorded on the interconnection applications (572 of 573 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970886. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer200
Nevada127
Yolo85
El Dorado74
Sutter23
Yuba23
Solano20
Contra Costa8
Amador3
Sonoma3
Butte2
Napa2
Marin1
Sacramento1
San Joaquin1

Top cities

CityInstalls
Auburn105
Grass Valley66
Davis46
Rocklin41
Lincoln34
Woodland23
Yuba City22
El Dorado Hills20
Placerville18
Vacaville14
West Sacramento14
Cameron Park13
Granite Bay13
Penn Valley13
Loomis10

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNRIVER SOLAR POWER SYSTEMS572
Sunriver Solar Power Systems1

Common questions

Where does SUNRIVER SOLAR POWER SYSTEMS install solar?

Its installs are spread across 15 counties. The most are in Placer County (200 installs), followed by Nevada County (127).

How often does SUNRIVER SOLAR POWER SYSTEMS install batteries with solar?

18.0% of its interconnected solar installs include battery storage across all years, and 62.2% in the last 24 months (23 of 37).

How many SUNRIVER SOLAR POWER SYSTEMS installs are under NEM 3.0 (the Net Billing Tariff)?

75 of its 573 interconnected installs (13.1% of the 573 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.