How many solar installs has Syntrol done in California, and which license number is on its installs?

Syntrol has 149 residential solar installs interconnected in California, active in the records from 2013 through 2019 (Jul 19, 2013 to May 8, 2019), most of them in Fresno County (23), Merced County (17) and Kern County (14). The license number recorded on most of its installs, 728304, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
149
Last 24 months
0
Total capacity
880.4 kW DC
Median system size
5.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
23.5% of 149 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 15, lease 7, other 13
First install
Jul 19, 2013
Latest install
May 8, 2019
Counties
27
Utilities
PGE 148, SCE 1
CSLB license
728304

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201400
201500
2016410
20171030
201830
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 149 interconnected installs with a tariff recorded (149) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04328.9%not counted
NEM 2.010671.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 35 of Syntrol’s installs the utility recorded a third-party ownership type: PPA 15, lease 7, prepaid lease 0, other 13. Across all installers, 13 residential systems list a third-party owner name that matches Syntrol exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova12
syntrol12
Mosaic5
CA First3
California First1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 148 of Syntrol’s 149 installs name a module maker in the “Generator Manufacturer” fields, and most of those (93, 62.8%) used modules recorded as Canadian Solar.

Across all years, 149 of Syntrol’s 149 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (127, 85.2%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar093
Trina Solar021
Qcells010
Silfab010
LG05
Inverter makerEnphase0127
SolarEdge016
SMA05
Fronius01
Power-One01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 148 of 149 installs, inverters on 149. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
728304Not found in the CSLB License Master file pulled Nov 4, 2026147

License numbers are the ones the utilities recorded on the interconnection applications (148 of 149 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Fresno23
Merced17
Kern14
San Joaquin13
Placer8
Contra Costa7
Santa Clara7
Solano7
Yuba6
Alameda4
Amador4
Monterey4
Sonoma4
Sutter4
Yolo4
Lake3
Nevada3
Butte2
Calaveras2
Colusa2
El Dorado2
Marin2
Napa2
Tulare2
Madera1
San Luis Obispo1
Shasta1

Top cities

CityInstalls
Fresno17
Los Banos15
Bakersfield12
Stockton7
Manteca5
Vacaville5
Clovis4
Gilroy3
Marysville3
Salinas3
San Jose3
Yuba City3
Antioch2
Auburn2
Dos Palos2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
syntrol103
Syntrol23
Syntrol dba Unisun Solar23

Common questions

Where does Syntrol install solar?

Its installs are spread across 27 counties. The most are in Fresno County (23 installs), followed by Merced County (17).

How often does Syntrol install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Syntrol installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 149 interconnected installs with a tariff recorded (149) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.