TOBY TAYLOR LLC DBA SIMPLE POWER CA

How many solar installs has TOBY TAYLOR LLC DBA SIMPLE POWER CA done in California, and which license number is on its installs?

TOBY TAYLOR LLC DBA SIMPLE POWER CA has 54 residential solar installs interconnected in California, active in the records from 2024 through 2025 (May 31, 2024 to Sep 15, 2025), most of them in Los Angeles County (18), Tulare County (16) and Kern County (10). CSLB lists license 1111652 (SIMPLE POWER CA) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
54
Last 24 months
38
Total capacity
374.3 kW DC
Median system size
6.4 kW DC
With battery storage
94.4% all time; 100.0% last 24 months
Third-party owned
79.6% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
54 installs, latest Sep 15, 2025
Ownership types recorded
PPA 41, other 2
Median battery size
9.7 kWh (51 installs list a capacity)
First install
May 31, 2024
Latest install
Sep 15, 2025
Counties
8
Utilities
SCE 54
CSLB license
1111652

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20243330
20252121
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

54 of its 54 interconnected installs (100.0% of the 54 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.4% of those include battery storage. The latest Net Billing Tariff install was approved Sep 15, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff54100.0%51 (94.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 43 of TOBY TAYLOR LLC DBA SIMPLE POWER CA’s installs the utility recorded a third-party ownership type: PPA 41, lease 0, prepaid lease 0, other 2. Across all installers, 2 residential systems list a third-party owner name that matches TOBY TAYLOR LLC DBA SIMPLE POWER CA exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
LightReach29
LightReach Financing3
Goodleap2
Solrite2
Concert1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 38 of TOBY TAYLOR LLC DBA SIMPLE POWER CA’s 38 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 47.4%) used modules recorded as Qcells.

In the last 24 months, 38 of TOBY TAYLOR LLC DBA SIMPLE POWER CA’s 38 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (33, 86.8%) used inverters recorded as Enphase.

In the last 24 months, 38 of TOBY TAYLOR LLC DBA SIMPLE POWER CA’s 38 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (30, 78.9%) used batteries recorded as Enphase.

51 of 51 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1827
Hyundai1313
Canadian Solar35
United Renewable Energy2not in top list
LONGi1not in top list
Inverter makerEnphase3349
SolarEdge55
SunPower11
Battery makerEnphase3040
SolarEdge55
sonnen12
SunPower13
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 54 installs, inverters on 54. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1111652SIMPLE POWER CA (Limited Liability)CLEAR, Pending IFSC-10 Electrical ContractorOct 20, 2023Oct 31, 202754

License numbers are the ones the utilities recorded on the interconnection applications (54 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending suspension date of Jan 28, 2027 for license 1111652. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list TOBY TAYLOR LLC DBA SIMPLE POWER CA’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
City and County of San Francisco1111652112
unincorporated San Diego County1111652101

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles18
Tulare16
Kern10
Riverside4
Orange2
Ventura2
San Bernardino1
Santa Barbara1

Top cities

CityInstalls
Delano10
Tulare7
Arcadia3
Diamond Bar3
Palmdale3
Temple City3
Porterville2
San Gabriel2
Visalia2
Alhambra1
Earlimart1
Farmersville1
Fullerton1
Goleta1
Huntington Beach1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TOBY TAYLOR LLC DBA SIMPLE POWER CA54

Common questions

Where does TOBY TAYLOR LLC DBA SIMPLE POWER CA install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (18 installs), followed by Tulare County (16).

How often does TOBY TAYLOR LLC DBA SIMPLE POWER CA install batteries with solar?

94.4% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (38 of 38).

How many TOBY TAYLOR LLC DBA SIMPLE POWER CA installs are under NEM 3.0 (the Net Billing Tariff)?

54 of its 54 interconnected installs (100.0% of the 54 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.