Trinity Construction Enterprises Inc.

How many solar installs has Trinity Construction Enterprises Inc. done in California, and which license number is on its installs?

Trinity Construction Enterprises Inc. has 35 residential solar installs interconnected in California, active in the records from 2015 through 2020 (Jul 17, 2015 to Oct 23, 2020), most of them in Fresno County (12), Tulare County (12) and Kings County (6). CSLB lists license 853740 (TRINITY POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
35
Last 24 months
0
Total capacity
251 kW DC
Median system size
6.4 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
40.0% of 35 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 12, other 2
First install
Jul 17, 2015
Latest install
Oct 23, 2020
Counties
6
Utilities
SCE 20, PGE 15
CSLB license
853740

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201550
201660
201780
201830
201960
202070
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 35 interconnected installs with a tariff recorded (35) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01131.4%not counted
NEM 2.02468.6%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 14 of Trinity Construction Enterprises Inc.’s installs the utility recorded a third-party ownership type: PPA 12, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches Trinity Construction Enterprises Inc. exactly.

Third-party owner named on its installsInstalls
Kilowatt Financial, LLC5
OneRoof Energy4
Lifestyle Energy Financial2
Sunnova2
ORE Developer Corporate Entity1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 35 of Trinity Construction Enterprises Inc.’s 35 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (11, 31.4%) used modules recorded as Qcells.

Across all years, 35 of Trinity Construction Enterprises Inc.’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (19, 54.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells011
Trina Solar011
SunPower08
Canadian Solar01
Hyundai01
Inverter makerEnphase019
SolarEdge010
Fronius06

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 35 of 35 installs, inverters on 35. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Trinity Construction Enterprises Inc. as developer on 4 battery storage projects and as installer on 2 (2 name it as both), 4 projects in all with 1,122 kWh of storage. 1 have the status Paid, with $3,831 in current incentive allocations. Applications were received from Nov 26, 2019 to Dec 29, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid117$3,831
Cancelled31,106$383,092

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Non-Residential Storage Equity31,106$383,0920$0
Small Residential Storage117$3,8311$3,831

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
853740TRINITY POWER (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJan 27, 2005Mar 31, 202735

License numbers are the ones the utilities recorded on the interconnection applications (35 of 35 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 853740. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Fresno12
Tulare12
Kings6
Madera2
Riverside2
San Bernardino1

Top cities

CityInstalls
Fresno6
Hanford5
Visalia4
Exeter2
Goshen2
Tulare2
Ahwahnee1
Armona1
Biola1
Clovis1
Corona1
Dinuba1
Eastvale1
Kingsburg1
Madera1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TRINITY CONSTRUCTION ENTERPRISES INC17
Trinity Construction Enterprises Inc.8
Trinity Construction Enterprises, Inc.6
Trinity Construction Enterprises2
Trinity Construction Enterprises, Inc1
Trinity Construction Enterprises, INC.1

Common questions

Where does Trinity Construction Enterprises Inc. install solar?

Its installs are spread across 6 counties. The most are in Fresno County (12 installs), followed by Tulare County (12).

How often does Trinity Construction Enterprises Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Trinity Construction Enterprises Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 35 interconnected installs with a tariff recorded (35) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.