21ST CENTURY SOLAR
How many solar installs has 21ST CENTURY SOLAR done in California, and which license number is on its installs?
21ST CENTURY SOLAR has 138 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jan 13, 2021 to Apr 24, 2026), most of them in Riverside County (67), San Bernardino County (29) and Orange County (27). The license number recorded on most of its installs, 661434, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 138
- Last 24 months
- 20
- Total capacity
- 1,106.2 kW DC
- Median system size
- 7.6 kW DC
- With battery storage
- 19.6% all time; 60.0% last 24 months
- Third-party owned
- 0.0% of 138 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 16 installs, latest Feb 23, 2026
- Ownership types recorded
- none recorded
- Median battery size
- 13.5 kWh (27 installs list a capacity)
- First install
- Jan 13, 2021
- Latest install
- Apr 24, 2026
- Counties
- 4
- Utilities
- SCE 138
- CSLB license
- 661434
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2021 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2021 | 30 | 5 |
| 2022 | 33 | 6 |
| 2023 | 41 | 2 |
| 2024 | 18 | 3 |
| 2025 | 12 | 9 |
| 2026 (through Aug 31, 2026) | 4 | 2 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
16 of its 138 interconnected installs (11.6% of the 138 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The latest Net Billing Tariff install was approved Feb 23, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 122 | 88.4% | 17 (13.9%) |
| Net Billing Tariff | 16 | 11.6% | 10 (62.5%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on 21ST CENTURY SOLAR’s installs. No residential system in the file lists a third-party owner name that matches 21ST CENTURY SOLAR exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 20 of 21ST CENTURY SOLAR’s 20 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 45.0%) used modules recorded as Qcells.
In the last 24 months, 20 of 21ST CENTURY SOLAR’s 20 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (7, 35.0%) used inverters recorded as Enphase.
In the last 24 months, 9 of 21ST CENTURY SOLAR’s 20 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 66.7%) used batteries recorded as Tesla.
23 of 27 battery-paired PG&E and SCE installs (85.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 9 | 70 |
| RNG International | 3 | 4 | |
| Canadian Solar | 2 | 4 | |
| Suzhou Talesun Solar Technologies | 2 | not in top list | |
| Hyundai | 1 | not in top list | |
| Inverter maker | Enphase | 7 | 52 |
| Tesla | 4 | 7 | |
| RNG International | 3 | 4 | |
| Schneider Electric | 2 | not in top list | |
| SMA | 2 | not in top list | |
| Battery maker | Tesla | 6 | 6 |
| Schneider Electric | 2 | 2 | |
| Generac | 1 | 14 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 137 of 138 installs, inverters on 138. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 661434 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 138 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (138 of 138 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other names reported under the same license
- Mohr Power Solar, Inc.: 963 installs, license 661434
- MOHRPOWER SOLAR, INC: 141 installs, license 661434
Counties
| County | Installs |
|---|---|
| Riverside | 67 |
| San Bernardino | 29 |
| Orange | 27 |
| Los Angeles | 15 |
Top cities
| City | Installs |
|---|---|
| Corona | 32 |
| Norco | 12 |
| Redlands | 7 |
| Huntington Beach | 6 |
| Santa Ana | 6 |
| Beaumont | 4 |
| Riverside | 4 |
| Upland | 4 |
| Moreno Valley | 3 |
| Ontario | 3 |
| Orange | 3 |
| Rancho Cucamonga | 3 |
| Whittier | 3 |
| Chino Hills | 2 |
| Claremont | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| 21ST CENTURY SOLAR | 138 |
Common questions
Where does 21ST CENTURY SOLAR install solar?
Its installs are spread across 4 counties. The most are in Riverside County (67 installs), followed by San Bernardino County (29).
How often does 21ST CENTURY SOLAR install batteries with solar?
19.6% of its interconnected solar installs include battery storage across all years, and 60.0% in the last 24 months (12 of 20).
How many 21ST CENTURY SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?
16 of its 138 interconnected installs (11.6% of the 138 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.