Mohr Power Solar, Inc.

How many solar installs has Mohr Power Solar, Inc. done in California, and which license number is on its installs?

Mohr Power Solar, Inc. has 963 residential solar installs interconnected in California, active in the records from 2001 through 2024 (Oct 18, 2001 to Mar 14, 2024), most of them in Riverside County (419), San Bernardino County (240) and Los Angeles County (154). The license number recorded on most of its installs, 661434, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
963
Last 24 months
0
Total capacity
5,374.8 kW DC
Median system size
5.1 kW DC
With battery storage
1.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
3.7% of 681 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 7, other 18
Median battery size
9.8 kWh (12 installs list a capacity)
First install
Oct 18, 2001
Latest install
Mar 14, 2024
Counties
7
Utilities
SCE 935, SDGE 28
CSLB license
661434

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2001 to 2026

YearInstalls interconnectedWith battery storage
200140
200260
2003110
2004240
2005300
2006570
20071140
2008960
2009920
2010900
2011620
2012140
2013330
2014200
2015500
2016440
2017500
2018550
2019576
2020443
202173
202200
202320
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 963 interconnected installs with a tariff recorded (963) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.077680.6%not counted
NEM 2.018719.4%12 (6.5%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 25 of Mohr Power Solar, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 7, prepaid lease 0, other 18. Across all installers, 13 residential systems list a third-party owner name that matches Mohr Power Solar, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Mohr Power Solar, Inc.13
SunPower Solar Program I, LLC6
Kilowatt Systems, LLC2
My Solar I, LLC1
MySolar I, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 291 of Mohr Power Solar, Inc.’s 963 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (67, 23.0%) used modules recorded as Qcells.

Across all years, 949 of Mohr Power Solar, Inc.’s 963 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (345, 36.4%) used inverters recorded as SunPower.

Across all years, 11 of Mohr Power Solar, Inc.’s 963 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 81.8%) used batteries recorded as LG.

11 of 12 battery-paired PG&E and SCE installs (91.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells067
SolarWorld045
TSEC030
Solaria029
Canadian Solar028
Inverter makerSunPower0345
Enphase0190
SMA0130
SolarEdge0101
Advanced Energy, Inc.065
Battery makerLG09
Generac02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 291 of 963 installs, inverters on 949. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Mohr Power Solar, Inc. as developer on 18 battery storage projects and as installer on 18 (18 name it as both), 18 projects in all with 207 kWh of storage. 13 have the status Paid, with $29,975 in current incentive allocations. Applications were received from Nov 2, 2018 to Nov 15, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid13151$29,975
Cancelled439$9,278
RRF Rejected117$2,992

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage17190$39,25313$29,975
Not stated117$2,9920$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
661434Not found in the CSLB License Master file pulled Nov 4, 2026934

License numbers are the ones the utilities recorded on the interconnection applications (934 of 963 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Riverside419
San Bernardino240
Los Angeles154
Orange120
San Diego23
Ventura4
Kern3

Top cities

CityInstalls
Corona153
Riverside56
Apple Valley43
Moreno Valley30
Murrieta24
Norco23
Redlands18
Alta Loma17
Rancho Cucamonga16
Palm Springs15
Chino14
Fontana14
Victorville14
Perris13
Temecula13

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MOHR POWER SOLAR648
Mohr Power Solar, Inc.211
MOHR POWER SOLAR INC74
Mohr Power Solar,13
MOHR POWER SOLAR, INC.9
Mohr Power Solar4
Mohr Power Solar Inc3
Mohr Power Solar Inc.1

Common questions

Where does Mohr Power Solar, Inc. install solar?

Its installs are spread across 7 counties. The most are in Riverside County (419 installs), followed by San Bernardino County (240).

How often does Mohr Power Solar, Inc. install batteries with solar?

1.3% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Mohr Power Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 963 interconnected installs with a tariff recorded (963) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.