CSS Electric

How many solar installs has CSS Electric done in California, and which license number is on its installs?

CSS Electric has 106 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Oct 20, 2016 to Aug 17, 2026), most of them in Merced County (44), San Mateo County (10) and San Joaquin County (9). CSLB lists license 1014016 (CSS ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
106
Last 24 months
9
Total capacity
847.1 kW DC
Median system size
7.2 kW DC
With battery storage
11.3% all time; 100.0% last 24 months
Third-party owned
6.6% of 106 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
13 installs, latest Aug 17, 2026
Ownership types recorded
PPA 7
First install
Oct 20, 2016
Latest install
Aug 17, 2026
Counties
20
Utilities
PGE 105, SCE 1
CSLB license
1014016

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
201760
201860
201980
2020120
2021180
2022120
2023271
202494
202522
2026 (through Aug 31, 2026)55

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

13 of its 106 interconnected installs (12.3% of the 106 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.9%not counted
NEM 2.09286.8%2 (2.2%)
Net Billing Tariff1312.3%10 (76.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 7 of CSS Electric’s installs the utility recorded a third-party ownership type: PPA 7, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches CSS Electric exactly.

Third-party owner named on its installsInstalls
sunrun6
YSG Solar1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of CSS Electric’s 9 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 66.7%) used modules recorded as Hyundai.

In the last 24 months, 9 of CSS Electric’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 9 of CSS Electric’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 77.8%) used batteries recorded as Enphase.

12 of 12 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai69
Qcells354
Inverter makerEnphase938
FranklinWH1not in top list
Tesla13
Battery makerEnphase79
FranklinWH11
Tesla12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 104 of 106 installs, inverters on 106. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1014016CSS ELECTRIC (Corporation)CLEARC-10 Electrical ContractorMay 11, 2016May 31, 2028106

License numbers are the ones the utilities recorded on the interconnection applications (106 of 106 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1014016. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list CSS Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232025Total
City and County of San Francisco1014016112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Merced44
San Mateo10
San Joaquin9
Santa Clara8
Fresno6
Tuolumne6
Alameda5
Stanislaus4
Madera3
Butte1
Contra Costa1
Mendocino1
Monterey1
Napa1
Nevada1
San Francisco1
San Luis Obispo1
Santa Cruz1
Solano1
Tulare1

Top cities

CityInstalls
Los Banos19
Merced16
Atwater6
Fresno4
San Jose4
Sonora4
Tracy3
Castro Valley2
Coarsegold2
Manteca2
Newman2
Oakdale2
San Carlos2
San Mateo2
Stockton2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CSS ELECTRIC91
CSS Electric12
css electric3

Common questions

Where does CSS Electric install solar?

Its installs are spread across 20 counties. The most are in Merced County (44 installs), followed by San Mateo County (10).

How often does CSS Electric install batteries with solar?

11.3% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (9 of 9).

How many CSS Electric installs are under NEM 3.0 (the Net Billing Tariff)?

13 of its 106 interconnected installs (12.3% of the 106 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.