Clear Solar Solutions Inc dba CSS Electr

How many solar installs has Clear Solar Solutions Inc dba CSS Electr done in California, and which license number is on its installs?

Clear Solar Solutions Inc dba CSS Electr has 42 residential solar installs interconnected in California, active in the records from 2017 through 2023 (Apr 6, 2017 to Mar 8, 2023), most of them in Merced County (12), San Joaquin County (6) and Santa Clara County (5). CSLB lists license 1014016 (CSS ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
0
Total capacity
252 kW DC
Median system size
5.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
40.5% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 16, lease 1
First install
Apr 6, 2017
Latest install
Mar 8, 2023
Counties
13
Utilities
PGE 38, SCE 4
CSLB license
1014016

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017170
2018130
2019100
202010
202100
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.042100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 17 of Clear Solar Solutions Inc dba CSS Electr’s installs the utility recorded a third-party ownership type: PPA 16, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Clear Solar Solutions Inc dba CSS Electr exactly.

Third-party owner named on its installsInstalls
SunRun15
Grid Tech2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 42 of Clear Solar Solutions Inc dba CSS Electr’s 42 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 35.7%) used modules recorded as Trina Solar.

Across all years, 42 of Clear Solar Solutions Inc dba CSS Electr’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (33, 78.6%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar015
Qcells08
Panasonic06
Hyundai04
Canadian Solar03
Inverter makerSolarEdge033
Enphase05
SMA04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 42 installs, inverters on 42. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Clear Solar Solutions Inc dba CSS Electr as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 54 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jun 1, 2023 to Jul 20, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled254$37,285

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency136$34,0450$0
Large-Scale Storage118$3,2400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1014016CSS ELECTRIC (Corporation)CLEARC-10 Electrical ContractorMay 11, 2016May 31, 202840

License numbers are the ones the utilities recorded on the interconnection applications (42 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1014016. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Clear Solar Solutions Inc dba CSS Electr’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232025Total
City and County of San Francisco1014016112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Merced12
San Joaquin6
Santa Clara5
Alameda3
Contra Costa3
Stanislaus3
Tulare3
Orange2
Fresno1
Kings1
Monterey1
Sonoma1
Tuolumne1

Top cities

CityInstalls
Los Banos5
San Jose3
Tracy3
Atwater2
Manteca2
Merced2
Newman2
Orange2
Planada2
Brentwood1
Concord1
Cupertino1
Cutler1
Dinuba1
Dos Palos1

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Clear Solar Solutions Inc dba CSS Electr15
Clear Solar Solutions, Inc6
Clear Solar Solutions Inc DBA CSS Electric5
CLEAR SOLAR SOLUTIONS, INC5
CLEAR SOLAR SOLUTIONS INC4
Clear Solar Solutions2
clear solar solutions1
clear solar solutions inc1
Clear Solar Solutions inc1
Clear Solar Solutions INC1
Clear Solar Solutions, INC1

Common questions

Where does Clear Solar Solutions Inc dba CSS Electr install solar?

Its installs are spread across 13 counties. The most are in Merced County (12 installs), followed by San Joaquin County (6).

How often does Clear Solar Solutions Inc dba CSS Electr install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Clear Solar Solutions Inc dba CSS Electr installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.