DRH Electrical, Inc

How many solar installs has DRH Electrical, Inc done in California, and which license number is on its installs?

DRH Electrical, Inc has 102 residential solar installs interconnected in California, active in the records from 2009 through 2018 (Jun 29, 2009 to Mar 20, 2018), most of them in Los Angeles County (42), San Bernardino County (27) and Riverside County (26). The license number recorded on most of its installs, 868037, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
102
Last 24 months
0
Total capacity
699.2 kW DC
Median system size
6.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
18.5% of 92 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 9, lease 1, prepaid lease 7
First install
Jun 29, 2009
Latest install
Mar 20, 2018
Counties
7
Utilities
SCE 100, PGE 1, SDGE 1
CSLB license
868037

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201000
201120
201200
201350
2014120
2015260
2016310
2017230
201820
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 102 interconnected installs with a tariff recorded (102) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09694.1%not counted
NEM 2.065.9%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 17 of DRH Electrical, Inc’s installs the utility recorded a third-party ownership type: PPA 9, lease 1, prepaid lease 7, other 0. No residential system in the file lists a third-party owner name that matches DRH Electrical, Inc exactly.

Third-party owner named on its installsInstalls
SunRun16
Sunpower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 73 of DRH Electrical, Inc’s 102 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (22, 30.1%) used modules recorded as SolarWorld.

Across all years, 102 of DRH Electrical, Inc’s 102 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (53, 52.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld022
Hyundai017
Canadian Solar013
Qcells010
Trina Solar07
Inverter makerEnphase053
SolarEdge038
SMA07
Fronius04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 73 of 102 installs, inverters on 102. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names DRH Electrical, Inc as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 5 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 30, 2014 to Apr 30, 2014.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled15$4,144

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated15$4,1440$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
868037Not found in the CSLB License Master file pulled Nov 4, 2026100

License numbers are the ones the utilities recorded on the interconnection applications (101 of 102 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles42
San Bernardino27
Riverside26
Orange4
Kern1
Tulare1
Ventura1

Top cities

CityInstalls
La Verne10
Claremont6
Fontana6
Corona5
Upland5
Cathedral City4
Pomona4
San Bernardino4
Covina3
San Dimas3
Alta Loma2
Desert Hot Springs2
Fullerton2
Grand Terrace2
Hemet2

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DRH Electrical, Inc66
DRH ELECTRICAL15
DRH ELECTRICAL, INC9
DRH Electrical, Inc.9
DRH Electrical2
DRH Electrical Inc1

Common questions

Where does DRH Electrical, Inc install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (42 installs), followed by San Bernardino County (27).

How often does DRH Electrical, Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many DRH Electrical, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 102 interconnected installs with a tariff recorded (102) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.