FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC has 710 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jul 24, 2020 to Jul 27, 2026), most of them in Los Angeles County (304), Orange County (296) and San Bernardino County (75). CSLB lists license 1066257 (FORME SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
710
Last 24 months
52
Total capacity
5,343.1 kW DC
Median system size
7 kW DC
With battery storage
10.0% all time; 80.8% last 24 months
Third-party owned
0.0% of 710 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
54 installs, latest Jul 27, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (71 installs list a capacity)
First install
Jul 24, 2020
Latest install
Jul 27, 2026
Counties
5
Utilities
SCE 710
CSLB license
1066257

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020250
2021773
202223112
20232759
2024579
20253024
2026 (through Aug 31, 2026)1514

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

54 of its 710 interconnected installs (7.6% of the 710 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.2% of those include battery storage. The latest Net Billing Tariff install was approved Jul 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.065692.4%32 (4.9%)
Net Billing Tariff547.6%39 (72.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 52 of FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC’s 52 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (23, 44.2%) used modules recorded as REC.

In the last 24 months, 52 of FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC’s 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (35, 67.3%) used inverters recorded as Enphase.

In the last 24 months, 42 of FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC’s 52 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (21, 50.0%) used batteries recorded as FranklinWH.

66 of 71 battery-paired PG&E and SCE installs (93.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC23189
Silfab6not in top list
Hyundai510
Qcells5107
Panasonic4214
Inverter makerEnphase35365
Tesla1446
SMA2not in top list
SolarEdge2216
Fronius1not in top list
Battery makerFranklinWH2122
Tesla1719
Enphase322
Franlin11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 668 of 710 installs, inverters on 710. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC as developer on 9 battery storage projects and as installer on 1 (1 name it as both), 9 projects in all with 160 kWh of storage. 5 have the status Paid, with $34,112 in current incentive allocations. Applications were received from Feb 16, 2023 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid591$34,112
Reserved229$17,040
Pending Reservation126$61,175
Cancelled114$13,300

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage575$10,9524$8,912
Equity Resiliency359$53,5001$25,200
Residential Solar and Storage Equity - AB 209 Non-POU126$61,1750$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1066257FORME SOLAR ELECTRIC (Limited Liability)CLEARC-10 Electrical ContractorJun 12, 2020Jun 30, 2028710

License numbers are the ones the utilities recorded on the interconnection applications (710 of 710 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1066257. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated San Diego County106625711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles304
Orange296
San Bernardino75
Riverside28
Ventura7

Top cities

CityInstalls
Fullerton41
Irvine39
Long Beach26
Brea19
Hacienda Heights19
Placentia18
Whittier18
Huntington Beach17
Torrance16
Chino Hills15
Lake Forest15
Walnut15
Buena Park13
Alta Loma12
Orange12

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC673
FIXED ENERGY LLC37

Common questions

Where does FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (304 installs), followed by Orange County (296).

How often does FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC install batteries with solar?

10.0% of its interconnected solar installs include battery storage across all years, and 80.8% in the last 24 months (42 of 52).

How many FIXED ENERGY LLC DBA FORME SOLAR ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

54 of its 710 interconnected installs (7.6% of the 710 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.