GREEN COMMERCIAL SYSTEMS

How many solar installs has GREEN COMMERCIAL SYSTEMS done in California, and which license number is on its installs?

GREEN COMMERCIAL SYSTEMS has 209 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jul 6, 2022 to Apr 18, 2026), most of them in Los Angeles County (79), San Bernardino County (16) and Riverside County (15). The license number recorded on most of its installs, 1054222, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
209
Last 24 months
26
Total capacity
1,702.3 kW DC
Median system size
7.2 kW DC
With battery storage
24.4% all time; 84.6% last 24 months
Third-party owned
0.0% of 209 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
37 installs, latest Apr 18, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (39 installs list a capacity)
First install
Jul 6, 2022
Latest install
Apr 18, 2026
Counties
28
Utilities
SCE 139, PGE 70
CSLB license
1054222

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022313
20231169
20244727
20251311
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

37 of its 209 interconnected installs (17.7% of the 209 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.2% of those include battery storage. The latest Net Billing Tariff install was approved Apr 18, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.017282.3%18 (10.5%)
Net Billing Tariff3717.7%33 (89.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GREEN COMMERCIAL SYSTEMS’s installs. No residential system in the file lists a third-party owner name that matches GREEN COMMERCIAL SYSTEMS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 25 of GREEN COMMERCIAL SYSTEMS’ 26 installs name a module maker in the “Generator Manufacturer” fields, and most of those (14, 56.0%) used modules recorded as Panasonic.

In the last 24 months, 26 of GREEN COMMERCIAL SYSTEMS’ 26 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 53.8%) used inverters recorded as Enphase.

In the last 24 months, 14 of GREEN COMMERCIAL SYSTEMS’ 26 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (11, 78.6%) used batteries recorded as Enphase.

38 of 51 battery-paired PG&E and SCE installs (74.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic14174
Qcells1122
Hanhwa Q Cell22
JinkoSolar12
Inverter makerEnphase14115
Qcells812
SolarEdge468
Battery makerEnphase1123
SolarEdge24
HomeGrid1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 207 of 209 installs, inverters on 209. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1054222Not found in the CSLB License Master file pulled Nov 4, 2026209

License numbers are the ones the utilities recorded on the interconnection applications (209 of 209 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list GREEN COMMERCIAL SYSTEMS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232024Total
City and County of San Francisco1054222011
unincorporated San Diego County1054222202

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles79
San Bernardino16
Riverside15
Ventura14
Alameda12
Orange11
Mendocino9
Contra Costa7
San Mateo6
Santa Clara6
Humboldt5
San Francisco4
San Joaquin4
Inyo2
Lake2
Marin2
Mariposa2
Monterey2
Santa Barbara2
Amador1
Butte1
Colusa1
Kern1
Merced1
San Benito1
San Luis Obispo1
Shasta1
Stanislaus1

Top cities

CityInstalls
Palmdale5
Redondo Beach5
Calabasas4
Canyon Country4
Long Beach4
San Francisco4
Saugus4
Eureka3
Fort Bragg3
Garden Grove3
Hawthorne3
Moreno Valley3
San Jose3
Simi Valley3
Temple City3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN COMMERCIAL SYSTEMS209

Common questions

Where does GREEN COMMERCIAL SYSTEMS install solar?

Its installs are spread across 28 counties. The most are in Los Angeles County (79 installs), followed by San Bernardino County (16).

How often does GREEN COMMERCIAL SYSTEMS install batteries with solar?

24.4% of its interconnected solar installs include battery storage across all years, and 84.6% in the last 24 months (22 of 26).

How many GREEN COMMERCIAL SYSTEMS installs are under NEM 3.0 (the Net Billing Tariff)?

37 of its 209 interconnected installs (17.7% of the 209 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources