GREEN ROAD SOLAR

How many solar installs has GREEN ROAD SOLAR done in California, and which license number is on its installs?

GREEN ROAD SOLAR has 134 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jun 17, 2014 to Jul 17, 2026), most of them in Los Angeles County (77), Riverside County (17) and San Bernardino County (14). CSLB lists license 978687 (GREEN ROAD SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
134
Last 24 months
62
Total capacity
1,421.9 kW DC
Median system size
9.3 kW DC
With battery storage
44.8% all time; 71.0% last 24 months
Third-party owned
19.1% of 131 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
85 installs, latest Jul 17, 2026
Ownership types recorded
PPA 8, lease 17
Median battery size
13.5 kWh (60 installs list a capacity)
First install
Jun 17, 2014
Latest install
Jul 17, 2026
Counties
6
Utilities
SCE 133, PGE 1
CSLB license
978687

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201430
201540
201600
201700
201800
201900
202090
2021314
202200
202374
20242613
20254130
2026 (through Aug 31, 2026)139

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

85 of its 134 interconnected installs (63.4% of the 134 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 64.7% of those include battery storage. The latest Net Billing Tariff install was approved Jul 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.075.2%not counted
NEM 2.04231.3%5 (11.9%)
Net Billing Tariff8563.4%55 (64.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 25 of GREEN ROAD SOLAR’s installs the utility recorded a third-party ownership type: PPA 8, lease 17, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches GREEN ROAD SOLAR exactly.

Third-party owner named on its installsInstalls
Sunnova Financing10
Sunnova5
Sun Edison4
Lightreach3
Palmetto Lightreach3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 62 of GREEN ROAD SOLAR’s 62 installs name a module maker in the “Generator Manufacturer” fields, and most of those (43, 69.4%) used modules recorded as Qcells.

In the last 24 months, 62 of GREEN ROAD SOLAR’s 62 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (34, 54.8%) used inverters recorded as Tesla.

In the last 24 months, 44 of GREEN ROAD SOLAR’s 62 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (41, 93.2%) used batteries recorded as Tesla.

60 of 60 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4383
Hyundai1213
SEG Solar44
Canadian Solar217
LG1not in top list
Inverter makerTesla3435
Enphase2657
SolarEdge326
ABB1not in top list
Battery makerTesla4153
Enphase33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 130 of 134 installs, inverters on 134. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
978687GREEN ROAD SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorNov 14, 2012Nov 30, 2028134

License numbers are the ones the utilities recorded on the interconnection applications (134 of 134 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 978687. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GREEN ROAD SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019202020222023Total
unincorporated San Diego County97868712216

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles77
Riverside17
San Bernardino14
Orange12
Ventura9
Kern5

Top cities

CityInstalls
Monrovia13
Lancaster12
Palmdale6
Altadena4
Canyon Country4
Frazier Park4
La Crescenta4
Simi Valley4
Temecula4
Thousand Oaks4
Apple Valley3
Corona3
La Canada3
Murrieta3
Santa Clarita3

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN ROAD SOLAR127
Green Road Solar6
Green Road solar1

Common questions

Where does GREEN ROAD SOLAR install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (77 installs), followed by Riverside County (17).

How often does GREEN ROAD SOLAR install batteries with solar?

44.8% of its interconnected solar installs include battery storage across all years, and 71.0% in the last 24 months (44 of 62).

How many GREEN ROAD SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

85 of its 134 interconnected installs (63.4% of the 134 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 64.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.