LA Power Center Corporation

How many solar installs has LA Power Center Corporation done in California, and which license number is on its installs?

LA Power Center Corporation has 630 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Aug 9, 2013 to Mar 10, 2026), most of them in Los Angeles County (204), Orange County (152) and San Bernardino County (105). CSLB lists license 978687 (GREEN ROAD SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
630
Last 24 months
2
Total capacity
4,737 kW DC
Median system size
6.3 kW DC
With battery storage
5.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
32.7% of 554 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Mar 10, 2026
Ownership types recorded
PPA 125, lease 54, prepaid lease 2
Median battery size
13.5 kWh (31 installs list a capacity)
First install
Aug 9, 2013
Latest install
Mar 10, 2026
Counties
10
Utilities
SCE 568, SDGE 53, PGE 9
CSLB license
978687

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013220
2014540
20151650
2016320
2017180
2018310
2019563
2020474
2021441
2022809
20237714
202420
202510
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 630 interconnected installs (0.3% of the 630 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Mar 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.027643.8%not counted
NEM 2.035255.9%31 (10.2%)
Net Billing Tariff20.3%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 181 of LA Power Center Corporation’s installs the utility recorded a third-party ownership type: PPA 125, lease 54, prepaid lease 2, other 0. Across all installers, 2 residential systems list a third-party owner name that matches LA Power Center Corporation exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sun-Edison104
SunPower Capital, LLC.32
SunPower17
Lifestyle Energy6
Sunnova6

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of LA Power Center Corporation’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Qcells.

In the last 24 months, 2 of LA Power Center Corporation’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of LA Power Center Corporation’s 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

30 of 31 battery-paired PG&E and SCE installs (96.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1180
Silfab1not in top list
Inverter makerEnphase2149
Battery makerTesla020
LG08
Enphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 507 of 630 installs, inverters on 630. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names LA Power Center Corporation as developer on 19 battery storage projects and as installer on 18 (18 name it as both), 19 projects in all with 384 kWh of storage. 5 have the status Paid, with $59,620 in current incentive allocations. Applications were received from Aug 17, 2020 to Aug 24, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid5106$59,620
Reserved353$7,920
Cancelled10192$111,619
RRF Rejected134$5,204

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage12192$30,1593$8,020
Equity Resiliency6158$149,0002$51,600
Not stated134$5,2040$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
978687GREEN ROAD SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorNov 14, 2012Nov 30, 2028622

License numbers are the ones the utilities recorded on the interconnection applications (627 of 630 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 978687. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list LA Power Center Corporation’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019202020222023Total
unincorporated San Diego County97868712216

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles204
Orange152
San Bernardino105
Riverside88
Ventura38
San Diego32
Kern7
Santa Clara2
Alameda1
San Mateo1

Top cities

CityInstalls
Mission Viejo25
Corona20
Orange18
Santa Clarita18
Valencia18
Alta Loma15
Fontana15
Laguna Hills15
Canyon Country14
Saugus14
Simi Valley14
Irvine12
Temecula12
Chino11
Agoura Hills10

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LA POWER CENTER CORPORATION209
LA Power Center Corporation166
LA Power Center Corp.93
LA POWER CENTER CORP70
LA Power Center43
LA Power Center Corp43
LA POWER CENTER2
La Power Center Corp1
LA power Center Corp1
LA Power Center corp1
La Power Center Corp.1

Common questions

Where does LA Power Center Corporation install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (204 installs), followed by Orange County (152).

How often does LA Power Center Corporation install batteries with solar?

5.4% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many LA Power Center Corporation installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 630 interconnected installs (0.3% of the 630 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.