Helio Power INC.

How many solar installs has Helio Power INC. done in California, and which license number is on its installs?

Helio Power INC. has 88 residential solar installs interconnected in California, active in the records from 2006 through 2017 (Aug 2, 2006 to May 1, 2017), most of them in Riverside County (26), Alameda County (10) and Butte County (9). The license number recorded on most of its installs, 915598, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
88
Last 24 months
0
Total capacity
552.3 kW DC
Median system size
5.3 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
4.7% of 64 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 3
First install
Aug 2, 2006
Latest install
May 1, 2017
Counties
21
Utilities
PGE 58, SCE 30
CSLB license
915598

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200650
200770
200890
200930
201010
201110
201210
201340
2014190
2015150
2016180
201750
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 88 interconnected installs with a tariff recorded (88) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08394.3%not counted
NEM 2.055.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of Helio Power INC.’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Helio Power INC. exactly.

Third-party owner named on its installsInstalls
HeliPower1
SUN RUN1
SunRun1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 62 of Helio Power INC.’s 88 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 24.2%) used modules recorded as Canadian Solar.

Across all years, 88 of Helio Power INC.’s 88 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (50, 56.8%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar015
Sharp012
Hyundai010
Mitsubishi Electric010
SolarWorld03
Inverter makerSolarEdge050
SMA028
Xantrex Technology Inc.05
Enphase04
APsystems (Altenergy Power System)01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 88 installs, inverters on 88. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
915598Not found in the CSLB License Master file pulled Nov 4, 202653

License numbers are the ones the utilities recorded on the interconnection applications (53 of 88 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Helio Power INC.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182020Total
unincorporated San Diego County915598527

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside26
Alameda10
Butte9
Santa Clara9
Contra Costa6
San Francisco4
San Mateo4
Placer3
San Bernardino3
Monterey2
Solano2
Amador1
Fresno1
Madera1
Marin1
Orange1
Santa Cruz1
Shasta1
Sonoma1
Stanislaus1
Yolo1

Top cities

CityInstalls
Corona4
Oroville4
San Francisco4
Canyon Lake3
Cathedral City3
Chico3
Murrieta3
Oakland3
Rancho Mirage3
Albany2
Berkeley2
Campbell2
Carmel Valley2
Danville2
Lincoln2

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HELIO POWER INC24
Helio Power INC.23
Helio Power16
Helio Power, Inc.11
HELIO POWER6
Helio Power Inc5
Helio Power Inc.2
Helio Power, Inc1

Common questions

Where does Helio Power INC. install solar?

Its installs are spread across 21 counties. The most are in Riverside County (26 installs), followed by Alameda County (10).

How often does Helio Power INC. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Helio Power INC. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 88 interconnected installs with a tariff recorded (88) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.