Infinity Electric

How many solar installs has Infinity Electric done in California, and which license number is on its installs?

Infinity Electric has 528 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Nov 7, 2011 to Apr 20, 2026), most of them in Orange County (367), Los Angeles County (73) and Ventura County (38). CSLB lists license 824287 (INFINITY SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Infinity Electric here carry more than one CSLB license number: 824287 on 478 (CSLB holder INFINITY SOLAR, Orange) and 889112 on 46 (CSLB holder INFINITY ELECTRIC, Ventura), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
528
Last 24 months
6
Total capacity
4,703.5 kW DC
Median system size
8 kW DC
With battery storage
14.6% all time; 66.7% last 24 months
Third-party owned
0.2% of 527 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Jun 16, 2025
Ownership types recorded
lease 1
Median battery size
13.2 kWh (77 installs list a capacity)
First install
Nov 7, 2011
Latest install
Apr 20, 2026
Counties
7
Utilities
SCE 528
CSLB license
824287, 889112

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201200
201300
201400
201510
201610
201790
201800
201900
202010
20212208
202227661
2023101
202444
202542
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 528 interconnected installs (1.3% of the 528 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved Jun 16, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0101.9%not counted
NEM 2.051196.8%72 (14.1%)
Net Billing Tariff71.3%5 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Infinity Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Infinity Electric exactly.

Third-party owner named on its installsInstalls
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Infinity Electric’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used modules recorded as Qcells.

In the last 24 months, 6 of Infinity Electric’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 4 of Infinity Electric’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used batteries recorded as Enphase.

54 of 77 battery-paired PG&E and SCE installs (70.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells627
Inverter makerEnphase4171
SolarEdge1218
Tesla121
Battery makerEnphase335
Tesla119

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 480 of 528 installs, inverters on 528. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
824287INFINITY SOLAR (Corporation)CLEARC-10 Electrical ContractorSep 16, 2003Sep 30, 2027478
889112INFINITY ELECTRIC (Limited Liability)CLEARC-10 Electrical ContractorJan 8, 2007Jun 30, 202746

License numbers are the ones the utilities recorded on the interconnection applications (528 of 528 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 824287, 889112. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Infinity Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182021Total
unincorporated San Diego County824287314

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange367
Los Angeles73
Ventura38
Riverside25
San Bernardino17
Santa Barbara7
Tulare1

Top cities

CityInstalls
Irvine44
Orange44
Yorba Linda38
Huntington Beach25
Mission Viejo20
Fullerton19
Garden Grove18
Santa Ana18
Costa Mesa14
Long Beach14
Lake Forest13
Ventura13
Tustin12
Trabuco Canyon11
Brea10

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Infinity Electric393
INFINITY ELECTRIC135

Common questions

Where does Infinity Electric install solar?

Its installs are spread across 7 counties. The most are in Orange County (367 installs), followed by Los Angeles County (73).

How often does Infinity Electric install batteries with solar?

14.6% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (4 of 6).

How many Infinity Electric installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 528 interconnected installs (1.3% of the 528 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.