PELL SOLAR ELECTRICITY

How many solar installs has PELL SOLAR ELECTRICITY done in California, and which license number is on its installs?

PELL SOLAR ELECTRICITY has 188 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 24, 2021 to Aug 24, 2026), most of them in San Bernardino County (104), Los Angeles County (33) and Riverside County (29). CSLB lists license 949122 (PELL SOLAR ELECTRICITY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
188
Last 24 months
53
Total capacity
2,046.1 kW DC
Median system size
10.1 kW DC
With battery storage
34.0% all time; 98.1% last 24 months
Third-party owned
2.7% of 188 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
27 installs, latest May 15, 2026
Ownership types recorded
PPA 2, lease 3
Median battery size
13.5 kWh (64 installs list a capacity)
First install
Mar 24, 2021
Latest install
Aug 24, 2026
Counties
5
Utilities
SCE 188
CSLB license
949122

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021240
2022350
2023621
20242118
20252726
2026 (through Aug 31, 2026)1919

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

27 of its 188 interconnected installs (14.4% of the 188 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved May 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.016185.6%37 (23.0%)
Net Billing Tariff2714.4%27 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of PELL SOLAR ELECTRICITY’s installs the utility recorded a third-party ownership type: PPA 2, lease 3, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PELL SOLAR ELECTRICITY exactly.

Third-party owner named on its installsInstalls
Palmetto Solar, LLC dba LightReach3
Solkraft2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 53 of PELL SOLAR ELECTRICITY’s 53 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 28.3%) used modules recorded as Qcells.

In the last 24 months, 53 of PELL SOLAR ELECTRICITY’s 53 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (26, 49.1%) used inverters recorded as Enphase.

In the last 24 months, 52 of PELL SOLAR ELECTRICITY’s 53 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (51, 98.1%) used batteries recorded as Tesla.

64 of 64 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells15110
JinkoSolar88
LG89
Hyundai66
Trina Solar6not in top list
Inverter makerEnphase2684
Tesla2026
SMA66
SolarEdge456
LG1not in top list
Battery makerTesla5156
Enphase17

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 182 of 188 installs, inverters on 188. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
949122PELL SOLAR ELECTRICITY (Corporation)CLEARC-10 Electrical ContractorJun 23, 2010Jun 30, 2028188

License numbers are the ones the utilities recorded on the interconnection applications (188 of 188 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 949122. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PELL SOLAR ELECTRICITY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
unincorporated San Diego County94912211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino104
Los Angeles33
Riverside29
Orange20
Ventura2

Top cities

CityInstalls
Fontana17
Rancho Cucamonga15
Alta Loma11
Upland11
Ontario10
Riverside10
Glendora7
Apple Valley5
Yorba Linda5
Chino Hills4
Claremont4
Norco4
Phelan4
Redlands4
Victorville4

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PELL SOLAR ELECTRICITY188

Common questions

Where does PELL SOLAR ELECTRICITY install solar?

Its installs are spread across 5 counties. The most are in San Bernardino County (104 installs), followed by Los Angeles County (33).

How often does PELL SOLAR ELECTRICITY install batteries with solar?

34.0% of its interconnected solar installs include battery storage across all years, and 98.1% in the last 24 months (52 of 53).

How many PELL SOLAR ELECTRICITY installs are under NEM 3.0 (the Net Billing Tariff)?

27 of its 188 interconnected installs (14.4% of the 188 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.