SMART ENERGY

How many solar installs has SMART ENERGY done in California, and which license number is on its installs?

SMART ENERGY has 617 residential solar installs interconnected in California, active in the records from 2011 through 2017 (Jul 28, 2011 to Jun 12, 2017), most of them in Riverside County (309), San Bernardino County (187) and Los Angeles County (62). The license number recorded on most of its installs, 990049, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
617
Last 24 months
0
Total capacity
4,010.6 kW DC
Median system size
6.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
78.4% of 375 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2, lease 286, other 6
First install
Jul 28, 2011
Latest install
Jun 12, 2017
Counties
11
Utilities
SCE 613, PGE 4
CSLB license
990049

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201160
2012360
20132190
20142660
2015880
201610
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 617 interconnected installs with a tariff recorded (617) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.061699.8%not counted
NEM 2.010.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 294 of SMART ENERGY’s installs the utility recorded a third-party ownership type: PPA 2, lease 286, prepaid lease 0, other 6. Across all installers, 4 residential systems list a third-party owner name that matches SMART ENERGY exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Capital, LLC246
SunPower Solar Program 1, LLC14
Sunnova Energy Corp11
Kilowatt Systems, LLC6
Kilow att Systems, LLC4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 4 of SMART ENERGY’s 617 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used modules recorded as SunPower.

Across all years, 617 of SMART ENERGY’s 617 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (216, 35.0%) used inverters recorded as ABB.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower02
Jiangsu Green Power PV01
Qcells01
Inverter makerABB0216
SunPower0149
Power-One0126
SMA077
Enphase041

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4 of 617 installs, inverters on 617. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990049Not found in the CSLB License Master file pulled Nov 4, 2026614

License numbers are the ones the utilities recorded on the interconnection applications (615 of 617 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Riverside309
San Bernardino187
Los Angeles62
Orange37
Ventura9
Tulare6
Fresno2
Santa Barbara2
Kern1
Napa1
Sonoma1

Top cities

CityInstalls
Corona60
Apple Valley39
Temecula33
Murrieta32
Fontana21
Hemet19
Victorville17
Wildomar17
Winchester16
Beaumont15
Chino Hills14
Menifee14
Moreno Valley14
Rancho Cucamonga13
Lake Elsinore12

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SMART ENERGY613
Smart Energy4

Common questions

Where does SMART ENERGY install solar?

Its installs are spread across 11 counties. The most are in Riverside County (309 installs), followed by San Bernardino County (187).

How often does SMART ENERGY install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many SMART ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 617 interconnected installs with a tariff recorded (617) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.