Smart Energy Solar

How many solar installs has Smart Energy Solar done in California, and which license number is on its installs?

Smart Energy Solar has 837 residential solar installs interconnected in California, active in the records from 2011 through 2018 (May 12, 2011 to Aug 7, 2018), most of them in Kern County (118), Fresno County (100) and Los Angeles County (96). The license number recorded on most of its installs, 990049, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
837
Last 24 months
0
Total capacity
5,193.3 kW DC
Median system size
5.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
44.1% of 657 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 40, lease 247, prepaid lease 3
First install
May 12, 2011
Latest install
Aug 7, 2018
Counties
44
Utilities
PGE 548, SCE 289
CSLB license
990049, 942329

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201160
201200
201330
20141850
20152710
20161820
20171850
201850
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 837 interconnected installs with a tariff recorded (837) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.064777.3%not counted
NEM 2.019022.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 290 of Smart Energy Solar’s installs the utility recorded a third-party ownership type: PPA 40, lease 247, prepaid lease 3, other 0. Across all installers, 117 residential systems list a third-party owner name that matches Smart Energy Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunpower108
Sunrun96
Spruce40
Smart Energy Solar14
sun run13

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 632 of Smart Energy Solar’s 837 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (184, 29.1%) used modules recorded as SunPower.

Across all years, 837 of Smart Energy Solar’s 837 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (282, 33.7%) used inverters recorded as Power-One.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0184
REC0131
Qcells093
Canadian Solar089
Hyundai030
Inverter makerPower-One0282
SMA0187
ABB0144
SolarEdge078
Solis (Ginlong)061

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 632 of 837 installs, inverters on 837. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990049Not found in the CSLB License Master file pulled Nov 4, 2026809
942329Not found in the CSLB License Master file pulled Nov 4, 202619

License numbers are the ones the utilities recorded on the interconnection applications (830 of 837 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Kern118
Fresno100
Los Angeles96
San Bernardino78
Riverside74
Alameda31
Orange29
Placer25
Sutter23
Solano19
El Dorado18
Contra Costa17
San Joaquin17
Merced16
Santa Clara16
Monterey15
Tulare14
Yolo14
Yuba14
Madera10
Sonoma10
Kings9
San Luis Obispo8
Lake6
Mendocino6
Calaveras5
Colusa5
Napa5
Santa Cruz5
Shasta4
Butte3
Humboldt3
Nevada3
San Francisco3
Santa Barbara3
Stanislaus3
Glenn2
Marin2
Tehama2
Ventura2
Amador1
Mariposa1
Plumas1
San Mateo1

Top cities

CityInstalls
Bakersfield95
Fresno53
West Covina23
Yuba City22
Vacaville15
Corona12
Apple Valley11
El Dorado Hills11
Hemet11
Lincoln11
Salinas11
San Jose11
Fontana10
Stockton10
Merced9

Names as recorded by the utilities

The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Smart Energy Solar426
Smart Energy Solar, Inc.146
SMART ENERGY SOLAR107
smart energy solar106
Smart Energy Solar Inc.14
Smart energy solar10
Smart Energy Solar, Inc9
Smart Energy solar6
Smart energy Solar5
Smart Energy SOlar3
Smart Energy Solar Inc2
SMART ENERGY SOLAR INC2
SMART ENERGY SOLAR, INC1

Common questions

Where does Smart Energy Solar install solar?

Its installs are spread across 44 counties. The most are in Kern County (118 installs), followed by Fresno County (100).

How often does Smart Energy Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Smart Energy Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 837 interconnected installs with a tariff recorded (837) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.