360 Solar Energy Inc

How many solar installs has 360 Solar Energy Inc done in California, and which license number is on its installs?

360 Solar Energy Inc has 888 residential solar installs interconnected in California, active in the records from 2011 through 2018 (Dec 5, 2011 to Aug 27, 2018), most of them in Riverside County (309), Los Angeles County (243) and San Bernardino County (164). The license number recorded on most of its installs, 943547, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
888
Last 24 months
0
Total capacity
5,876.8 kW DC
Median system size
6 kW DC
With battery storage
0.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
59.8% of 615 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 9, lease 350, prepaid lease 8, other 1
Median battery size
6.4 kWh (2 installs list a capacity)
First install
Dec 5, 2011
Latest install
Aug 27, 2018
Counties
7
Utilities
SCE 767, SDGE 121
CSLB license
943547

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
2012600
20132010
20142650
20151300
20161920
2017372
201810
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 888 interconnected installs with a tariff recorded (888) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.086297.1%not counted
NEM 2.0262.9%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 368 of 360 Solar Energy Inc’s installs the utility recorded a third-party ownership type: PPA 9, lease 350, prepaid lease 8, other 1. Across all installers, 13 residential systems list a third-party owner name that matches 360 Solar Energy Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SUNPOWER CAPITAL, LLC201
Sunrun50
Sunpower Solar Program 1, LLC43
SUNPOWER CORPORATION17
360 Solar Energy13

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 344 of 360 Solar Energy Inc’s 888 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (107, 31.1%) used modules recorded as LG.

Across all years, 884 of 360 Solar Energy Inc’s 888 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (232, 26.2%) used inverters recorded as Enphase.

Across all years, 2 of 360 Solar Energy Inc’s 888 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Tesla.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0107
Trina Solar063
SunPower049
SolarWorld040
Qcells029
Inverter makerEnphase0232
ABB0181
SolarEdge0124
Power-One0123
SMA0123
Battery makerTesla02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 344 of 888 installs, inverters on 884. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names 360 Solar Energy Inc as developer on 0 battery storage projects and as installer on 5 (0 name it as both), 5 projects in all with 68 kWh of storage. 3 have the status Paid, with $10,739 in current incentive allocations. Applications were received from Jul 12, 2017 to Jul 3, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid340$10,739
Cancelled228$11,200

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage568$21,9393$10,739

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
943547Not found in the CSLB License Master file pulled Nov 4, 2026723

License numbers are the ones the utilities recorded on the interconnection applications (729 of 888 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Riverside309
Los Angeles243
San Bernardino164
San Diego116
Orange42
Ventura13
Kern1

Top cities

CityInstalls
Canyon Lake58
Temecula37
Murrieta35
Corona27
Santa Clarita26
Saugus24
San Diego22
Newhall21
Valencia21
Canyon Country20
Oceanside20
Castaic18
Alta Loma16
Blythe16
Hesperia16

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
360 SOLAR ENERGY488
360 Solar Energy Inc225
360 Solar Energy, Inc.117
360 solar energy49
360 SOLAR ENERGY INC5
360 SOLAR ENERGY, INC4

Common questions

Where does 360 Solar Energy Inc install solar?

Its installs are spread across 7 counties. The most are in Riverside County (309 installs), followed by Los Angeles County (243).

How often does 360 Solar Energy Inc install batteries with solar?

0.3% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many 360 Solar Energy Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 888 interconnected installs with a tariff recorded (888) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.