Central Valley Energy Solutions

How many solar installs has Central Valley Energy Solutions done in California, and which license number is on its installs?

Central Valley Energy Solutions has 112 residential solar installs interconnected in California, active in the records from 2018 through 2021 (Nov 19, 2018 to Jun 11, 2021), most of them in Fresno County (74), Tulare County (10) and Kings County (8). The license number recorded on most of its installs, 1045634, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
112
Last 24 months
0
Total capacity
956.3 kW DC
Median system size
8.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
1.8% of 112 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2
First install
Nov 19, 2018
Latest install
Jun 11, 2021
Counties
12
Utilities
PGE 96, SCE 15, SDGE 1
CSLB license
1045634

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201830
2019300
2020590
2021200
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 112 interconnected installs with a tariff recorded (112) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0112100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of Central Valley Energy Solutions’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Central Valley Energy Solutions exactly.

Third-party owner named on its installsInstalls
Green Pace Capital1
GreenPace Capital1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 111 of Central Valley Energy Solutions’ 112 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (37, 33.3%) used modules recorded as Qcells.

Across all years, 112 of Central Valley Energy Solutions’ 112 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (66, 58.9%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells037
Solaria022
Mission Solar017
Canadian Solar015
JA Solar09
Inverter makerSolarEdge066
Enphase047

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 111 of 112 installs, inverters on 112. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1045634Not found in the CSLB License Master file pulled Nov 4, 2026112

License numbers are the ones the utilities recorded on the interconnection applications (112 of 112 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno74
Tulare10
Kings8
Contra Costa5
Madera5
Merced4
Nevada1
Riverside1
San Diego1
San Joaquin1
Santa Clara1
Stanislaus1

Top cities

CityInstalls
Fresno43
Clovis15
Sanger8
Hanford5
Selma5
Visalia5
Concord4
Lemoore3
Madera3
Chowchilla2
Kerman2
Merced2
Tulare2
Auburn1
Carlsbad1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CENTRAL VALLEY ENERGY SOLUTIONS87
Central Valley Energy Solutions25

Common questions

Where does Central Valley Energy Solutions install solar?

Its installs are spread across 12 counties. The most are in Fresno County (74 installs), followed by Tulare County (10).

How often does Central Valley Energy Solutions install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Central Valley Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 112 interconnected installs with a tariff recorded (112) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.