Evergreen Builders

How many solar installs has Evergreen Builders done in California, and which license number is on its installs?

Evergreen Builders has 349 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Mar 14, 2018 to Aug 27, 2026), most of them in Merced County (54), Contra Costa County (47) and San Joaquin County (45). CSLB lists license 1067368 (EVERGREEN BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
349
Last 24 months
82
Total capacity
2,564 kW DC
Median system size
6.8 kW DC
With battery storage
26.9% all time; 84.1% last 24 months
Third-party owned
11.7% of 349 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
143 installs, latest Aug 27, 2026
Ownership types recorded
PPA 2, lease 36, prepaid lease 2, other 1
Median battery size
8.4 kWh (18 installs list a capacity)
First install
Mar 14, 2018
Latest install
Aug 27, 2026
Counties
29
Utilities
PGE 261, SCE 88
CSLB license
1067368

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
201900
202000
2021100
2022830
20231476
20243225
20252218
2026 (through Aug 31, 2026)5445

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

143 of its 349 interconnected installs (41.0% of the 349 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.020659.0%4 (1.9%)
Net Billing Tariff14341.0%90 (62.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 41 of Evergreen Builders’s installs the utility recorded a third-party ownership type: PPA 2, lease 36, prepaid lease 2, other 1. No residential system in the file lists a third-party owner name that matches Evergreen Builders exactly.

Third-party owner named on its installsInstalls
Concert Finance36
CONCERT1
Concert / Propel1
Sun Power1
Sunlight1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 81 of Evergreen Builders’ 82 installs name a module maker in the “Generator Manufacturer” fields, and most of those (41, 50.6%) used modules recorded as Qcells.

In the last 24 months, 82 of Evergreen Builders’ 82 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (82, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 72 of Evergreen Builders’ 82 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (69, 95.8%) used batteries recorded as Enphase.

93 of 94 battery-paired PG&E and SCE installs (98.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4160
Aptos Solar1337
LONGi11not in top list
JinkoSolar9not in top list
JA Solar7not in top list
Inverter makerEnphase82314
SolarEdge725
SunPower716
ABB56
FranklinWH2not in top list
Battery makerEnphase6990
FranklinWH22
Tesla22
SolarEdge11
SunPower14

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 346 of 349 installs, inverters on 349. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1067368EVERGREEN BUILDERS (Corporation)CLEAR, 7073E ProbationB General Building Contractor; C-10 Electrical ContractorJul 28, 2020Jul 31, 2028348

License numbers are the ones the utilities recorded on the interconnection applications (349 of 349 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1067368. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Evergreen Builders’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232026Total
City and County of San Francisco1067368011
unincorporated San Diego County1067368101

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Merced54
Contra Costa47
San Joaquin45
Los Angeles25
Kern19
Riverside18
Fresno17
San Bernardino16
Alameda15
Stanislaus15
Santa Clara9
Ventura9
Madera8
Monterey8
Orange7
Tulare7
Solano6
Kings5
Mendocino3
San Benito3
Yolo3
San Mateo2
Santa Cruz2
Glenn1
Napa1
San Francisco1
Sonoma1
Sutter1
Yuba1

Top cities

CityInstalls
Stockton22
Dos Palos21
Atwater18
Bakersfield13
Tracy13
Oakley10
Fresno9
Pittsburg8
Antioch7
Madera7
Newman7
Riverbank6
San Jose6
Lancaster5
Livingston5

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EVERGREEN BUILDERS311
Evergreen Builders38

Common questions

Where does Evergreen Builders install solar?

Its installs are spread across 29 counties. The most are in Merced County (54 installs), followed by Contra Costa County (47).

How often does Evergreen Builders install batteries with solar?

26.9% of its interconnected solar installs include battery storage across all years, and 84.1% in the last 24 months (69 of 82).

How many Evergreen Builders installs are under NEM 3.0 (the Net Billing Tariff)?

143 of its 349 interconnected installs (41.0% of the 349 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.