Graham Solar Systems

How many solar installs has Graham Solar Systems done in California, and which license number is on its installs?

Graham Solar Systems has 301 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Oct 18, 2016 to Aug 5, 2026), most of them in San Bernardino County (51), Santa Clara County (38) and Placer County (36). CSLB lists license 1010200 (GRAHAM SOLAR SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
301
Last 24 months
11
Total capacity
2,361.1 kW DC
Median system size
6.9 kW DC
With battery storage
4.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 40.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
4.3% of 301 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Apr 8, 2025
Ownership types recorded
PPA 13
Median battery size
13.6 kWh (8 installs list a capacity)
First install
Oct 18, 2016
Latest install
Aug 5, 2026
Counties
29
Utilities
PGE 167, SCE 102, SDGE 32
CSLB license
1010200

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201640
201750
2018590
2019140
2020130
2021290
2022590
2023975
2024133
202573
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 301 interconnected installs (3.7% of the 301 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Apr 8, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.082.7%not counted
NEM 2.028293.7%7 (2.8%)
Net Billing Tariff113.7%4 (40.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 13 of Graham Solar Systems’s installs the utility recorded a third-party ownership type: PPA 13, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Graham Solar Systems exactly.

Third-party owner named on its installsInstalls
SolKraft13

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of Graham Solar Systems’ 11 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 20.0%) used modules recorded as LG.

In the last 24 months, 11 of Graham Solar Systems’ 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 54.5%) used inverters recorded as Enphase.

In the last 24 months, 2 of Graham Solar Systems’ 11 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as FranklinWH.

8 of 11 battery-paired PG&E and SCE installs (72.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG256
Qcells233
Aptos Solar1not in top list
Canadian Solar1not in top list
EG41not in top list
Inverter makerEnphase6165
EG43not in top list
Aptos Solar1not in top list
FranklinWH1not in top list
SMA16
Battery makerFranklinWH13
Tesla14

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 272 of 301 installs, inverters on 301. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1010200GRAHAM SOLAR SYSTEMS INC (Corporation)CLEAR, WC Susp PendingB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJan 8, 2016Nov 30, 2026299

License numbers are the ones the utilities recorded on the interconnection applications (301 of 301 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1010200. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Graham Solar Systems’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018202120222023202420252026Total
City and County of San Francisco101020021110410230
unincorporated San Diego County101020001210004
unincorporated Marin County101020001000001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino51
Santa Clara38
Placer36
San Diego30
Riverside28
San Joaquin23
Alameda19
Los Angeles12
El Dorado9
Kern8
Contra Costa6
Solano6
Orange5
Yolo5
Sonoma3
Sutter3
Yuba3
Amador2
Butte2
Napa2
Tulare2
Calaveras1
Monterey1
San Benito1
San Luis Obispo1
San Mateo1
Santa Cruz1
Shasta1
Ventura1

Top cities

CityInstalls
San Jose29
Stockton21
Yucca Valley14
Rocklin11
Lincoln10
Hayward8
Beaumont7
Fremont7
Auburn6
Granite Bay6
Desert Hot Springs5
Escondido5
La Puente5
Twentynine Palms5
Barstow4

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GRAHAM SOLAR SYSTEMS INC194
Graham Solar Systems88
Graham Solar Systems, Inc.7
GRAHAM SOLAR SYSTEMS, INC5
GRAHAM SOLAR SYSTEMS, INC.4
Graham Solar Systems Inc.2
Graham Solar Systems Inc1

Common questions

Where does Graham Solar Systems install solar?

Its installs are spread across 29 counties. The most are in San Bernardino County (51 installs), followed by Santa Clara County (38).

How often does Graham Solar Systems install batteries with solar?

4.1% of its interconnected solar installs include battery storage across all years, and 40.0% in the last 24 months (4 of 10). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Graham Solar Systems installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 301 interconnected installs (3.7% of the 301 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.