NEXT PHASE ELECTRIC INC

How many solar installs has NEXT PHASE ELECTRIC INC done in California, and which license number is on its installs?

NEXT PHASE ELECTRIC INC has 3,702 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Oct 18, 2018 to Aug 31, 2026), most of them in Kern County (2,963), Fresno County (275) and Tulare County (209). CSLB lists license 1025263 (NEXT PHASE ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,702
Last 24 months
304
Total capacity
30,814.3 kW DC
Median system size
7.9 kW DC
With battery storage
11.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
11.5% of 3,702 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
440 installs, latest Aug 31, 2026
Ownership types recorded
PPA 417, lease 2, prepaid lease 2, other 3
Median battery size
11.5 kWh (189 installs list a capacity)
First install
Oct 18, 2018
Latest install
Aug 31, 2026
Counties
24
Utilities
PGE 3,180, SCE 517, SDGE 5
CSLB license
1025263

Is NEXT PHASE ELECTRIC INC still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (155 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201830
20191460
20202920
20218260
20221,1386
202382631
2024203145
2025176158
2026 (through Aug 31, 2026)9286

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

440 of its 3,702 interconnected installs (11.9% of the 3,702 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.080.2%not counted
NEM 2.03,25487.9%29 (0.9%)
Net Billing Tariff44011.9%390 (89.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 424 of NEXT PHASE ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 417, lease 2, prepaid lease 2, other 3. Across all installers, 6 residential systems list a third-party owner name that matches NEXT PHASE ELECTRIC INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
EverBright159
Goodleap63
SolKraft57
Good Leap32
Solwerks19

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 274 of NEXT PHASE ELECTRIC INC’s 304 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (136, 49.6%) used modules recorded as Qcells.

In the last 24 months, 304 of NEXT PHASE ELECTRIC INC’s 304 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (214, 70.4%) used inverters recorded as Enphase.

In the last 24 months, 220 of NEXT PHASE ELECTRIC INC’s 304 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (139, 63.2%) used batteries recorded as Enphase.

364 of 426 battery-paired PG&E and SCE installs (85.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1362,144
Znshine59142
Aptos Solar43not in top list
Hyundai11not in top list
JA Solar8not in top list
Inverter makerEnphase2142,763
Tesla100113
SolarEdge14924
FranklinWH10not in top list
ABB6not in top list
Battery makerEnphase139268
Tesla6869
FranklinWH1021
LG11
PointGuard Energy Inc.1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,959 of 3,702 installs, inverters on 3,702. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names NEXT PHASE ELECTRIC INC as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 34 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 29, 2024 to Apr 30, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled15$714
RRF Rejected329$4,063

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage15$7140$0
Not stated329$4,0630$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1025263NEXT PHASE ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorMar 28, 2017Mar 31, 20273,701

License numbers are the ones the utilities recorded on the interconnection applications (3,701 of 3,702 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1025263. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern2,963
Fresno275
Tulare209
Los Angeles81
Kings31
San Bernardino27
Riverside26
Madera17
Santa Barbara12
Ventura11
Solano7
Merced6
San Joaquin6
Orange5
San Diego5
Sutter5
Contra Costa4
Monterey3
Alameda2
San Luis Obispo2
Yuba2
Mendocino1
Santa Clara1
Stanislaus1

Top cities

CityInstalls
Bakersfield2,573
Fresno186
Shafter148
Delano80
Visalia72
Tulare61
Clovis55
Tehachapi39
Wasco33
Porterville32
Taft27
Hanford18
Mc Farland17
Saugus16
Arvin14

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NEXT PHASE ELECTRIC INC3,602
Next Phase Electric96
Next Phase electric3
NEXT-PHASE-ELECTRIC-INC1

Common questions

Where does NEXT PHASE ELECTRIC INC install solar?

Its installs are spread across 24 counties. The most are in Kern County (2,963 installs), followed by Fresno County (275).

How often does NEXT PHASE ELECTRIC INC install batteries with solar?

11.5% of its interconnected solar installs include battery storage across all years, and 90.0% in the last 24 months (271 of 301). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many NEXT PHASE ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

440 of its 3,702 interconnected installs (11.9% of the 3,702 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.