Peace of Mind Electric

How many solar installs has Peace of Mind Electric done in California, and which license number is on its installs?

Peace of Mind Electric has 333 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Jun 3, 2011 to Aug 31, 2026), most of them in Riverside County (179), San Diego County (56) and San Bernardino County (53). CSLB lists license 883823 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
333
Last 24 months
21
Total capacity
3,116.6 kW DC
Median system size
8.4 kW DC
With battery storage
14.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.3% of 330 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
28 installs, latest Aug 31, 2026
Ownership types recorded
PPA 1
Median battery size
13.5 kWh (38 installs list a capacity)
First install
Jun 3, 2011
Latest install
Aug 31, 2026
Counties
6
Utilities
SCE 266, SDGE 67
CSLB license
883823

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201220
201310
201420
2015220
2016280
2017240
2018160
2019251
2020270
2021390
2022516
2023619
2024167
20251311
2026 (through Aug 31, 2026)54

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

28 of its 333 interconnected installs (8.4% of the 333 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06820.4%not counted
NEM 2.023771.2%16 (8.5%)
Net Billing Tariff288.4%22 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Peace of Mind Electric’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Peace of Mind Electric exactly.

Third-party owner named on its installsInstalls
JOSHUA MOLACEK1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 20 of Peace of Mind Electric’s 21 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 45.0%) used modules recorded as Qcells.

In the last 24 months, 21 of Peace of Mind Electric’s 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 57.1%) used inverters recorded as Tesla.

In the last 24 months, 17 of Peace of Mind Electric’s 21 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (11, 64.7%) used batteries recorded as Tesla.

38 of 38 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells9137
Aptos Solar715
REC2not in top list
Canadian Solar1not in top list
Ureco1not in top list
Inverter makerTesla1217
Enphase7212
SolarEdge267
iPower1not in top list
Battery makerTesla1111
Enphase423
SolarEdge22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 324 of 333 installs, inverters on 333. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Peace of Mind Electric as developer on 14 battery storage projects and as installer on 9 (9 name it as both), 14 projects in all with 276 kWh of storage. 5 have the status Paid, with $101,682 in current incentive allocations. Applications were received from Aug 4, 2021 to May 29, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid5105$101,682
Reserved110$1,303
Cancelled8161$111,448

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency9193$189,0365$101,682
Small Residential Storage346$6,7450$0
Large-Scale Storage119$6,6530$0
Residential Storage Equity119$12,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
883823Sole owner license (name not shown)CLEARC-10 Electrical ContractorSep 9, 2006Sep 30, 2028321

License numbers are the ones the utilities recorded on the interconnection applications (321 of 333 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 883823. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Peace of Mind Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201920202022202320242026Total
unincorporated San Diego County88382323161114

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside179
San Diego56
San Bernardino53
Orange23
Los Angeles21
Ventura1

Top cities

CityInstalls
Temecula56
Murrieta32
Hemet27
San Diego25
Menifee11
Corona9
Ramona9
San Bernardino7
Fontana6
Ontario6
Rancho Cucamonga6
Riverside6
Wildomar6
El Cajon5
Fallbrook5

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PEACE OF MIND ELECTRIC210
peace of mind electric68
Peace of Mind Electric55

Common questions

Where does Peace of Mind Electric install solar?

Its installs are spread across 6 counties. The most are in Riverside County (179 installs), followed by San Diego County (56).

How often does Peace of Mind Electric install batteries with solar?

14.3% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (17 of 17). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Peace of Mind Electric installs are under NEM 3.0 (the Net Billing Tariff)?

28 of its 333 interconnected installs (8.4% of the 333 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.