Skyline Energy Savers, Inc

How many solar installs has Skyline Energy Savers, Inc done in California, and which license number is on its installs?

Skyline Energy Savers, Inc has 395 residential solar installs interconnected in California, active in the records from 2010 through 2023 (Mar 2, 2010 to Oct 23, 2023), most of them in El Dorado County (95), San Joaquin County (65) and Contra Costa County (35). The license number recorded on most of its installs, 549017, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
395
Last 24 months
0
Total capacity
2,253.8 kW DC
Median system size
5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 395 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest May 18, 2023
Ownership types recorded
none recorded
First install
Mar 2, 2010
Latest install
Oct 23, 2023
Counties
22
Utilities
PGE 395
CSLB license
549017

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201050
201130
201280
2013260
2014330
2015250
2016390
2017470
2018290
2019350
2020400
2021290
2022520
2023240
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 395 interconnected installs (0.5% of the 395 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved May 18, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.014035.4%not counted
NEM 2.025364.1%0 (0.0%)
Net Billing Tariff20.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Skyline Energy Savers, Inc’s installs. No residential system in the file lists a third-party owner name that matches Skyline Energy Savers, Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 389 of Skyline Energy Savers, Inc’s 395 installs name a module maker in the “Generator Manufacturer” fields, and most of those (323, 83.0%) used modules recorded as Qcells.

Across all years, 395 of Skyline Energy Savers, Inc’s 395 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (385, 97.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells0323
Yingli032
Canadian Solar025
Kyocera03
Sharp02
Inverter makerEnphase0385
Enecsys05
Fronius02
Solectria Renewables, LLC02
Generac01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 389 of 395 installs, inverters on 395. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
549017Not found in the CSLB License Master file pulled Nov 4, 2026336

License numbers are the ones the utilities recorded on the interconnection applications (338 of 395 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
El Dorado95
San Joaquin65
Contra Costa35
Placer32
Solano27
Yolo22
Nevada18
Amador16
Alameda14
Calaveras14
Butte10
Sutter10
Yuba10
Santa Clara8
Colusa4
Napa4
Sonoma3
Merced2
Shasta2
Stanislaus2
Glenn1
Tehama1

Top cities

CityInstalls
Stockton39
El Dorado Hills33
Placerville22
Cameron Park15
West Sacramento12
Auburn10
Vallejo10
Manteca9
Grass Valley8
Marysville8
Oroville8
Yuba City8
Fairfield7
Lincoln7
Woodland7

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SKYLINE ENERGY SAVERS INC156
Skyline Energy Savers, Inc122
Skyline Energy Savers, Inc.58
Skyline Energy Savers35
Skyline Energy Savers Inc.19
Skyline Energy Savers Inc3
skyline Energy Savers, Inc.1
Skyline Energy Savers. Inc.1

Common questions

Where does Skyline Energy Savers, Inc install solar?

Its installs are spread across 22 counties. The most are in El Dorado County (95 installs), followed by San Joaquin County (65).

How often does Skyline Energy Savers, Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Skyline Energy Savers, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 395 interconnected installs (0.5% of the 395 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.