Solar Heroes

How many solar installs has Solar Heroes done in California, and which license number is on its installs?

Solar Heroes has 128 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jul 11, 2014 to Jan 30, 2026), most of them in San Diego County (64), Los Angeles County (25) and Ventura County (16). CSLB lists license 1074254 (SOLAR HEROES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
128
Last 24 months
49
Total capacity
1,051.9 kW DC
Median system size
6.6 kW DC
With battery storage
90.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 92.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 125 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
51 installs, latest Jan 30, 2026
Ownership types recorded
none recorded
Median battery size
38.4 kWh (56 installs list a capacity)
First install
Jul 11, 2014
Latest install
Jan 30, 2026
Counties
7
Utilities
SDGE 65, SCE 61, PGE 2
CSLB license
1074254

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201430
201500
201600
201700
201800
201900
202000
202120
2022269
20233122
20242216
2025439
2026 (through Aug 31, 2026)11

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

51 of its 128 interconnected installs (39.8% of the 128 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jan 30, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.032.3%not counted
NEM 2.07457.8%39 (86.7%)
Net Billing Tariff5139.8%18 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar Heroes’s installs. No residential system in the file lists a third-party owner name that matches Solar Heroes exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 47 of Solar Heroes’ 49 installs name a module maker in the “Generator Manufacturer” fields, and most of those (29, 61.7%) used modules recorded as Qcells.

In the last 24 months, 49 of Solar Heroes’ 49 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (29, 59.2%) used inverters recorded as Enphase.

In the last 24 months, 10 of Solar Heroes’ 49 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (4, 40.0%) used batteries recorded as HomeGrid.

26 of 57 battery-paired PG&E and SCE installs (45.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2948
Canadian Solar526
Hyundai3not in top list
REC38
Point Guard2not in top list
Inverter makerEnphase2962
Tesla810
SolarEdge632
Sol-Ark513
Power-One2not in top list
Battery makerHomeGrid417
Lithion Battery Inc.44
Lithion11
PointGuard11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 125 of 128 installs, inverters on 128. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Heroes as developer on 0 battery storage projects and as installer on 72 (0 name it as both), 72 projects in all with 3,178 kWh of storage. 56 have the status Paid, with $2,027,012 in current incentive allocations. Applications were received from May 20, 2020 to Jun 26, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid562,059$2,027,012
Cancelled161,119$1,013,950

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency692,548$2,505,46256$2,027,012
Residential Storage Equity3630$535,5000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1074254SOLAR HEROES (Corporation)CLEARC-10 Electrical ContractorMar 25, 2021Mar 31, 2027123

License numbers are the ones the utilities recorded on the interconnection applications (125 of 128 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1074254. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Heroes’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022202320242025Total
unincorporated San Diego County1074254368111240

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego64
Los Angeles25
Ventura16
Riverside12
San Bernardino5
Orange4
Nevada2

Top cities

CityInstalls
Bonsall30
San Diego13
Simi Valley11
Vista6
Santa Clarita5
Saugus5
La Jolla4
Canyon Country3
Corona3
Murrieta3
Rancho Santa Fe3
San Bernardino3
Beaumont2
Castaic2
Newhall2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Heroes65
SOLAR HEROES63

Common questions

Where does Solar Heroes install solar?

Its installs are spread across 7 counties. The most are in San Diego County (64 installs), followed by Los Angeles County (25).

How often does Solar Heroes install batteries with solar?

90.5% of its interconnected solar installs include battery storage across all years, and 92.9% in the last 24 months (13 of 14). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solar Heroes installs are under NEM 3.0 (the Net Billing Tariff)?

51 of its 128 interconnected installs (39.8% of the 128 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.