SOLARLINK ENERGY CONSTRUCTION INC

How many solar installs has SOLARLINK ENERGY CONSTRUCTION INC done in California, and which license number is on its installs?

SOLARLINK ENERGY CONSTRUCTION INC has 283 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Dec 6, 2020 to Aug 20, 2026), most of them in Alameda County (53), Nevada County (46) and Placer County (25). CSLB lists license 1042451 (SOLARLINK ENERGY CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
283
Last 24 months
123
Total capacity
2,200 kW DC
Median system size
7.4 kW DC
With battery storage
47.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 76.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
5.3% of 282 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
143 installs, latest Aug 20, 2026
Ownership types recorded
PPA 9, lease 4, prepaid lease 2
Median battery size
13.5 kWh (83 installs list a capacity)
First install
Dec 6, 2020
Latest install
Aug 20, 2026
Counties
31
Utilities
PGE 254, SCE 23, SDGE 6
CSLB license
1042451

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
202170
2022152
202311120
20245140
20256547
2026 (through Aug 31, 2026)3322

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

143 of its 283 interconnected installs (50.7% of the 282 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.4% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.041.4%not counted
NEM 2.013547.9%13 (9.8%)
Net Billing Tariff14350.7%114 (81.4%)
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 15 of SOLARLINK ENERGY CONSTRUCTION INC’s installs the utility recorded a third-party ownership type: PPA 9, lease 4, prepaid lease 2, other 0. No residential system in the file lists a third-party owner name that matches SOLARLINK ENERGY CONSTRUCTION INC exactly.

Third-party owner named on its installsInstalls
Lightreach4
Sunnova Energy3
EnFin2
hdm capital2
Light Reach2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 116 of SOLARLINK ENERGY CONSTRUCTION INC’s 123 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (46, 39.7%) used modules recorded as REC.

In the last 24 months, 122 of SOLARLINK ENERGY CONSTRUCTION INC’s 123 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (77, 63.1%) used inverters recorded as Tesla.

In the last 24 months, 75 of SOLARLINK ENERGY CONSTRUCTION INC’s 123 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (50, 66.7%) used batteries recorded as Tesla.

106 of 131 battery-paired PG&E and SCE installs (80.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC4660
LONGi2323
CertainTeed1322
Aptos Solar11not in top list
Qcells1161
Inverter makerTesla7793
Enphase23158
PointGuard Energy Inc.1717
SunPower4not in top list
Qcells313
Battery makerTesla5066
PointGuard Energy Inc.1515
Enphase922
FranklinWH12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 265 of 283 installs, inverters on 282. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLARLINK ENERGY CONSTRUCTION INC as developer on 157 battery storage projects and as installer on 154 (154 name it as both), 157 projects in all with 2,217 kWh of storage. 10 have the status Paid, with $200,051 in current incentive allocations. Applications were received from Mar 31, 2023 to Aug 14, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid10172$200,051
Reserved71949$2,052,489
Pending Reservation27383$875,509
Waitlist25330$730,252
Cancelled23356$691,864
RRF Rejected127$3,540

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU1161,558$3,521,4213$96,375
Residential Solar and Storage Equity - AB 20929383$858,6540$0
Equity Resiliency7185$147,8165$99,716
Small Residential Storage352$7,7542$3,960
Residential Solar and Storage Equity - Ratepayer113$14,5200$0
Not stated127$3,5400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1042451SOLARLINK ENERGY CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJul 30, 2018Jul 31, 2028282

License numbers are the ones the utilities recorded on the interconnection applications (282 of 283 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1042451. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOLARLINK ENERGY CONSTRUCTION INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20252026Total
City and County of San Francisco1042451202
unincorporated San Diego County1042451134

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Alameda53
Nevada46
Placer25
San Joaquin24
Contra Costa22
El Dorado21
Los Angeles18
Santa Clara15
Solano8
Yolo6
San Diego5
Calaveras4
Sutter4
Merced3
Orange3
San Mateo3
Stanislaus3
Amador2
Butte2
Marin2
San Bernardino2
Tuolumne2
Yuba2
Fresno1
Kern1
Napa1
Riverside1
San Francisco1
Shasta1
Sonoma1
Tehama1

Top cities

CityInstalls
Grass Valley25
Fremont15
Rocklin13
El Dorado Hills10
Newark9
Penn Valley9
San Jose9
Manteca8
Stockton8
Auburn7
Cameron Park6
Lincoln6
Tracy6
Castro Valley5
Hayward5

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARLINK ENERGY CONSTRUCTION INC279
SolarLink Energy Construction4

Common questions

Where does SOLARLINK ENERGY CONSTRUCTION INC install solar?

Its installs are spread across 31 counties. The most are in Alameda County (53 installs), followed by Nevada County (46).

How often does SOLARLINK ENERGY CONSTRUCTION INC install batteries with solar?

47.3% of its interconnected solar installs include battery storage across all years, and 76.9% in the last 24 months (90 of 117). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOLARLINK ENERGY CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

143 of its 283 interconnected installs (50.7% of the 282 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.4% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.