SUNGRID SOLAR has 227 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jan 29, 2021 to Aug 10, 2026), most of them in Los Angeles County (72), Orange County (58) and San Bernardino County (46). CSLB lists license 1037212 (SUNGRID SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
227
Last 24 months
30
Total capacity
1,747.4 kW DC
Median system size
7.2 kW DC
With battery storage
22.0% all time; 93.3% last 24 months
Third-party owned
8.4% of 227 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
41 installs, latest Aug 10, 2026
Ownership types recorded
PPA 18, lease 1
Median battery size
10.1 kWh (47 installs list a capacity)
First install
Jan 29, 2021
Latest install
Aug 10, 2026
Counties
14
Utilities
SCE 216, PGE 11
CSLB license
1037212

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021132
2022903
20238011
2024189
20252120
2026 (through Aug 31, 2026)55

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

41 of its 227 interconnected installs (18.1% of the 227 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.018681.9%15 (8.1%)
Net Billing Tariff4118.1%35 (85.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 19 of SUNGRID SOLAR’s installs the utility recorded a third-party ownership type: PPA 18, lease 1, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches SUNGRID SOLAR exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Light Reach5
Palmetto5
Palmetto Lightreach3
Sunpower3
Everbright1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 30 of SUNGRID SOLAR’s 30 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 40.0%) used modules recorded as Hyundai.

In the last 24 months, 30 of SUNGRID SOLAR’s 30 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 53.3%) used inverters recorded as Enphase.

In the last 24 months, 27 of SUNGRID SOLAR’s 30 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (15, 55.6%) used batteries recorded as Enphase.

47 of 50 battery-paired PG&E and SCE installs (94.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai1212
Qcells11114
United Renewable Energy352
AMPS Solar1not in top list
Freevolt1not in top list
Inverter makerEnphase1699
Tesla1119
SolarEdge278
SMA1not in top list
Battery makerEnphase1534
Tesla1212

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 214 of 227 installs, inverters on 227. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUNGRID SOLAR as developer on 0 battery storage projects and as installer on 3 (0 name it as both), 3 projects in all with 43 kWh of storage. 2 have the status Paid, with $5,292 in current incentive allocations. Applications were received from Aug 9, 2023 to Sep 17, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid238$5,292
Reserved15$714

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage343$6,0062$5,292

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1037212SUNGRID SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMar 26, 2018Mar 31, 2028227

License numbers are the ones the utilities recorded on the interconnection applications (227 of 227 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1037212. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUNGRID SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021202220232024Total
unincorporated San Diego County103721222318

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles72
Orange58
San Bernardino46
Riverside30
Ventura8
Kern4
Sonoma2
Alameda1
Contra Costa1
Lake1
Monterey1
Santa Barbara1
Sutter1
Tulare1

Top cities

CityInstalls
Victorville8
Los Angeles7
Garden Grove6
Hesperia6
Long Beach6
Costa Mesa5
Laguna Beach5
Canyon Country4
Chino4
Corona4
Huntington Beach4
Phelan4
Rancho Cucamonga4
San Jacinto4
Santa Ana4

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNGRID SOLAR227

Common questions

Where does SUNGRID SOLAR install solar?

Its installs are spread across 14 counties. The most are in Los Angeles County (72 installs), followed by Orange County (58).

How often does SUNGRID SOLAR install batteries with solar?

22.0% of its interconnected solar installs include battery storage across all years, and 93.3% in the last 24 months (28 of 30).

How many SUNGRID SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

41 of its 227 interconnected installs (18.1% of the 227 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.