CHARGED UP ENERGY

How many solar installs has CHARGED UP ENERGY done in California, and which license number is on its installs?

CHARGED UP ENERGY has 318 residential solar installs interconnected in California, active in the records from 2020 through 2024 (Apr 16, 2020 to May 29, 2024), most of them in Fresno County (146), Los Angeles County (36) and Merced County (30). The license number recorded on most of its installs, 692824, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
318
Last 24 months
0
Total capacity
2,425 kW DC
Median system size
7.1 kW DC
With battery storage
3.5% all time; no installs in the last 24 months last 24 months
Third-party owned
0.6% of 318 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Sep 25, 2023
Ownership types recorded
PPA 2
Median battery size
10.1 kWh (10 installs list a capacity)
First install
Apr 16, 2020
Latest install
May 29, 2024
Counties
22
Utilities
PGE 248, SCE 70
CSLB license
692824

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020300
2021520
20221468
2023873
202430
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 318 interconnected installs (0.6% of the 318 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Sep 25, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.031699.4%11 (3.5%)
Net Billing Tariff20.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of CHARGED UP ENERGY’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches CHARGED UP ENERGY exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Charged Up Energy1
Kuubix Global LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 280 of CHARGED UP ENERGY’s 318 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (86, 30.7%) used modules recorded as Canadian Solar.

Across all years, 318 of CHARGED UP ENERGY’s 318 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (216, 67.9%) used inverters recorded as Enphase.

Across all years, 8 of CHARGED UP ENERGY’s 318 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 87.5%) used batteries recorded as Enphase.

7 of 11 battery-paired PG&E and SCE installs (63.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar086
Qcells063
Silfab061
LONGi038
Aptos Solar017
Inverter makerEnphase0216
SolarEdge084
SMA026
SunPower09
ABB03
Battery makerEnphase07
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 280 of 318 installs, inverters on 318. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
692824Not found in the CSLB License Master file pulled Nov 4, 2026318

License numbers are the ones the utilities recorded on the interconnection applications (318 of 318 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno146
Los Angeles36
Merced30
San Joaquin23
Tulare21
San Bernardino10
Madera9
Contra Costa8
Stanislaus6
Kern4
Riverside4
Alameda3
San Mateo3
Santa Clara3
Calaveras2
Kings2
Sonoma2
Sutter2
El Dorado1
Santa Cruz1
Tuolumne1
Ventura1

Top cities

CityInstalls
Fresno116
Lancaster17
Merced17
Stockton11
Clovis8
Tulare8
San Joaquin7
San Bernardino6
Tracy6
Antioch5
Madera5
Palmdale5
Sanger5
Atwater4
Canyon Country4

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CHARGED UP ENERGY318

Common questions

Where does CHARGED UP ENERGY install solar?

Its installs are spread across 22 counties. The most are in Fresno County (146 installs), followed by Los Angeles County (36).

How often does CHARGED UP ENERGY install batteries with solar?

3.5% of its interconnected solar installs include battery storage across all years.

How many CHARGED UP ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 318 interconnected installs (0.6% of the 318 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.